My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 12:41:21 PM
Creation date
9/21/2020 9:32:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rq_-Ny PEI/RP1200-17 <br /> OPERATIONAPPENDIX C-7 <br /> AUTOMATIC TANK GAUGE <br /> Facility Name: Owner: <br /> Address: Address: <br /> City,State,Zip Code: City,State,Zip Code: <br /> Facility I.D.#: Phone#: <br /> Testing Company: Phone#: Date: <br /> This procedure is to determine whether the automatic tank guage(ATG)is operating properly.See PEI/RP1200 Section 8.2 for the <br /> inspection procedure. This procedure is applicable to tank level monitor stems that touch the bottom of the tank when in place. <br /> Tank Number <br /> Product Stored <br /> ATG Brand and Model <br /> 1.Tank Volume,gallons <br /> 2.Tank Diameter,inches <br /> 3.After removing the ATG from the tank,it has <br /> been inspected and any damaged or missing ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> parts replaced? <br /> 4.Float moves freely on the stem without ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> binding? <br /> 5.Fuel float level agrees with the value pro ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> grammed into the console? <br /> 6.Water float level agrees with the value pro- ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> grammed into the console? <br /> 7. Inch level from bottom of stem when 90% <br /> alarm is triggered. <br /> 8.Inch level at which the overfill alarm activates <br /> corresponds with value programmed in the ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> gauge? <br /> 9.Inch level from the bottom when the water <br /> float first triggers an alarm. <br /> 10.Inch level at which the water float alarm acti- <br /> vates corresponds with value programmed in ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> the gauge? <br /> If any answers in Lines 3,41 5,or 6 are"No,"the system has failed the test. <br /> Test Results ❑Pass ❑Fail I ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments: <br /> Tester's Name (print) Tester's Signature <br /> is pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.