My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 12:41:21 PM
Creation date
9/21/2020 9:32:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEIIRP1200-17 <br /> ELECTRONICAPPENDIX C-9 <br /> MECHANICAL AND O- <br /> PERFORMANCE TESTS <br /> Facility Name: Owner. <br /> Address: Address: <br /> City,State,Zip Code: City,State,Zip Code: <br /> Facility I.D.#: Phone#: <br /> Testing Company: I Phone#: Date: <br /> This data sheet can be used to test mechanical line leak detectors(MLLD)and electronic line leak detectors(ELLD)with submersible <br /> turbine pump(STP)systems.See PEI/RP1200 Sections 9.1 and 9.2 for test procedures. <br /> Line Number <br /> Product Stored <br /> Leak Detector Manufacturer <br /> Leak Detector Model <br /> Type of Leak Detector ❑MLLD ❑MLLD ❑MLLD ❑MLLD ❑MLLD ❑MLLD <br /> ❑ELLD ❑ELLD ❑ELLD ❑ELLD ❑ELLD ❑ELLD <br /> MLLD(ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG) <br /> STP Full Operating Pressure <br /> Check Valve Holding Pressure <br /> Line Resiliency(ml)(line bleed back vol- <br /> ume as measured from check valve hold- <br /> ing pressure to 0 psig) <br /> Step Through Time in Seconds(time the <br /> MLLD hesitates at metering pressure <br /> before going to full operating pressure <br /> as measured from 0 psig with no leak <br /> induced on the line) <br /> Metering Pressure(STP pressure when <br /> simulated leak rate 3 gph at 10 psig) <br /> Opening Time in Seconds(the time the <br /> MLLD opens to allow full pressure after <br /> simulated leak is stopped) <br /> Does the STP pressure remain at or <br /> below the metering pressure for at least <br /> 60 seconds when the simulated leak is ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> induced? <br /> Does the leak detector reset(trip)when ❑Yes ❑No ❑Yes ElNo 11Yes EJNo ❑Yes ElNo ElYes ElNo ❑Yes ElNo <br /> the line pressure is bled off to zero psir. <br /> Does the STP properly cycle on/off under ❑Yes ❑No ElYes El No [I Yes El No El Yes ❑No El Yes El No 11 Yes 1:1 No <br /> normal fuel system operation conditions? <br /> A"No"answer to either of the above questions indicates the MLLD fails the test. <br /> ELLD(ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG) <br /> STP Full Operating Pressure <br /> How many test cycles are observed <br /> before alarm/shutdown occurs? <br /> Does the simulated leak cause an alarm? ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> A"No"answer to the above question indi- <br /> cates the ELLD falls the test. <br /> Does the simulated leak cause an STP ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No []Yes ❑No ❑Yes ❑No <br /> shutdown? ❑NA ❑NA LINA ❑NA ❑NA ❑NA <br /> Test Results ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments: <br /> Tester's Name(print) Tester's Signature <br /> 0 pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.