My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 4:25:20 PM
Creation date
9/21/2020 11:08:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PhikTite Installation , Operation and Maintenance Manual , Page 17 Executive Order VR-101 -N <br /> Step 2 — New installation for an Above the Spill Containers Fiberglass Platform <br /> A . Using a tape measure , measure from top of the tank to finish grade . This is measurement "A " . <br /> Subtract 24 to 25 inches from measurement "A" to equal "XXX" . " A " — 24 inches = "XXX" . <br /> The result is the length of your riser measured from the top of the tank . Cut and thread one end of <br /> your 4 inch tank riser and dry fit it into the tank bung . Measure your riser ( installed into the tank <br /> bung ) from top of tank to the dimension found above , mark your risers . Cut your tank risers (fill & <br /> vapor) on the marks made above and thread this end . <br /> Step 3 — Dry Fit All Components <br /> Dry fit your riser to verify your measurements . After you have dry fit all components and are satisfied <br /> with your measurements , apply an approved fuel resistant , non hardening thread sealant ( pipe dope ) <br /> to the NPT threads on tank end of the risers . <br /> Step 4 — Install Tank Risers <br /> Install and torque the tank risers into the tank bungs . <br /> Step 5 — Install the M - 1600 Riser Support Bracket before you install the M/F 4X4 Riser Adaptors <br /> Install the M- 1600 Riser Support bracket between the two 4 inch ( Fill and Vapor) tank risers just below <br /> the top of the tank riser threads for the M/F 4X4 riser adaptors . Tighten and/or set the turn buckles to <br /> maintain the space between the two tank risers at 16 inches on center . <br /> Step 6 — Check your dimensions <br /> With the M/F 4X4 riser adaptors and spill containers dry fitted , check the dimension from the top of the <br /> spill container to finish grade or top of composite manway cover. You should have 4 'Y2 to 5 inches <br /> clearance . Verify the height of the fiber glass platform . Check for 1 'Yz inches of clearance between <br /> the top of the platform and the bottom of the composite manway cover. <br /> Step 7 — Install the M/F 4X4 riser adaptors <br /> Using the M/ F 4X4 Riser Adaptor Installation Instructions install and torque the M/F 4X4 riser <br /> adaptors . <br /> You are now ready to install the 85000 - EXT Spill Containers . Refer to the 85000- EXT Series Spill <br /> Container Installation Instructions in this document . <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.