Laserfiche WebLink
05/26/2009 13:14 9518273 49 DOUGLAS KUNEV PAGE 05/09 <br /> rtw a . erotic Lagoons Aftorage/Treatment of Livestock Manure versify of M—Page G of 10 <br /> i-atn design--Geometry <br /> Ciroular or square lagoons faciftele mixing and are usualilt mote W to Construct.Rectangular lagoons may be <br /> used,but length to-width ratlos of 3:1 at less are recommended.Avoid Irtarmappendages IsolaW from ilio main <br /> body of water:they contribute fails volume and may be a source of nuldence aandibons, <br /> Minimum depth should be 8 feet,although 8-to 20400t depths are doom depending off anitriIf numbers,runt fres, <br /> slope and underground geology,Deem lagoons offer areae advantog4s: <br /> • A smaller surface area requdrktg less land. <br /> • More thorough mixing of lagoon contents by rising gas bubbles. <br /> • Minimum odors, <br /> • Laas ammonia loss to the atmosphem, <br /> s R-iFlcierit use tfx marchritow aeration. <br /> Earthen dike and bank slopes usually range from 2:1 to 3:1.A slope of ;1 or im is moommended for the <br /> establMinent of vegetative cover and for safe mowing.A minimum 10-knot top width Is recommended;however, <br /> greater widths may be desirable for operation of tractors with agitVm, <br /> An erre Mency spillway should be pro at a minimum of me foot b4 jaw the top of the berm triter allowaneo is made <br /> for settlement.it should be located as close to natural ground as posa to,The spillway is intended for darn prateetioon <br /> only In ties case of extreme fIWdinQ and is not to bit ured ft a rpilMaW in KAU Of pumping down ft WO&M <br /> Construction techniques--Sealing <br /> Proper latwon construction will ensure proundwaler resmaroes aro p and the ikon will oerfonri as teouired <br /> during its useful life,The fonowing s pa ase included in most guicWno�for accepted construction techniques and <br /> methods for lagoons: <br /> 1, site pmparatforr <br /> Ail trees,grass and organic matter should be removed from the Topsoil should be stackla"ad)aoent to tete <br /> aonstruathm alba for later placentent on the loop and exposed alop�a for establish Ing gross tomer.After the <br /> foundeffan area Is stripped,Its ba ted to bond with they fol by removing loose,dry matWW:scan"g: <br /> disking;adjusting moisture,and compacting as necessary. <br /> 2. CL"Otrench <br /> A cutoff trench may be required to remove sand,gravel or other I r-conducting materhils to prevent leakage <br /> under the embankment. <br /> 3. Excavatlefr <br /> Room,sand lenses,gravel and other materials not suitable for seklhrg should be removed from the <br /> iMpOrNYtIMpn4 Farmrradnn nhexr&i ilr a,dfir.Wnr M mnnfnrr,tf a naval In widilinn to nhfaininp pnipwr 1ppmn vnlrnna <br /> 4. Embankments <br /> Lagoon embankments should be constructed to Taro for settling�uaualiy 5 percent extra),mowing and erosion <br /> prevention.Suitable excavated materials free of sod,roots,frozen sol,aonse more than 6 inches In diameter or <br /> WW 014160onabie Inktanal should be used for fill.The minimum Moisture content of the fill mated and <br /> foundation should form a ball when Kneaded by hand that will nat separate,UWrlence has shown fftat <br /> with suitable avis material,three passes of a sheepstoot rdiler(Flgum 2)per 6-inch fill iitt on the embankment or <br /> bottom seal will provicie adequate compacton for sestina, <br /> S. Seal eongrt ollon <br /> Lagoons must have a seal on the bottom and sides sufficiently rmeable to protect groundwater.Seal <br /> corlsi ucdon guidelines call for ovemmovaW and mc6mpactlon of seal material in lots not omeding <br /> is inches compactirto depth(not more than a mrd deep tenors&mpacton). i no tow s Inonss or ere bottom <br /> sed may be scariffed and compacted In place to eliminate removal and reptaoemem,The seal material should be <br /> within two peroenat below and four paroant above the optimum m�stum content for oompactlon.In general,a <br /> minimum of a 1dootOick clay seal must be provided an dte txftttrin and skies of a lagoon.The deeper the <br /> lagoon,the thicker the required seat,up to 4.6 feet thick far a walir depth of 25 feet.A givers permeability or leach <br /> rate,such as 1 x 1W centimeters per second.is a typical seal achstruction specification.Sall amendments such <br /> as betrtonite,Bode ash or artificial liners may be required to obtaki a proper seat.The lagoon seal should be <br /> c svered arida water irnmodiatoly aftr construction to prownt deyit nM Moking(at toast two foot abovo tho <br /> highest bottom eleuaaffala). <br /> Figufe 2 <br /> v` A sh*sfwt rower is commonly used to compact <br /> the Ilay seat during co nntrwion of a lagoon. <br /> I <br /> I <br /> hu►://extensiorLmissouri.edu/publications/Display .aspx?P=EQ387 5/21/2009 <br />