My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2009 - 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOWMAN
>
944
>
4400 - Solid Waste Program
>
PR0400042
>
CORRESPONDENCE_2009 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 11:58:17 AM
Creation date
9/21/2020 12:24:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2009 - 2014
RECORD_ID
PR0400042
PE
4452
FACILITY_ID
FA0000120
FACILITY_NAME
OLIVERA FOOD INC
STREET_NUMBER
944
STREET_NAME
BOWMAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19128019
CURRENT_STATUS
01
SITE_LOCATION
944 BOWMAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0512612009 13:14 9518273-2-49 DOUGLAS KUNEV PAGE 07109 <br /> W-18 AnMOID1C L49001151 =9e/1 rrvatme t of Livestock Manm versity of M1...Page 8 of 1 U <br /> a A <br /> between the upper pump4ow mark and the spillway is the vakrme of 25-year,24-hour atom.This volune is <br /> called The safety volume. <br /> tithe open-lot surraee area contributing to the lagoon Inflow Is greater Ion 70 percent of the lagoon area,the safety <br /> volume depth Is computed using rte fall ing fottrula! <br /> Safety v9kmhe depth-0.67 tet a((Square foot lot sumacs x 0.6 fast)I square foot lagoon Surfer arse) <br /> Pump-down or manure level markers <br /> Pumlydo>hm or manure level markers.or indicators,are a simple but irr porlant component of a manure stone TO Iffy, <br /> Such a marker enables the operator to ascertain quickly and easily the degree of fill of the lagoon,the point at which <br /> pumping or omptying should begin,and the paint at which it should on ,The presence of a durable,easily read marker <br /> givca inapootlon or regulawry porsonncl confidonom trot a lagoon is Leung monogod properly. <br /> Experience has shams that pump-downmarkars must be mate of dule mallerlois and proWY Instsiled to afford the <br /> long life needed,The operator or InapooW should be able to ascertain the following information when observing a <br /> pumpdown marker. <br /> . ften pumping operations should begin. <br /> . Man pumping operaons snoumo enc, <br /> c Laval at which overflow will occur. <br /> ® Fraction of total storage that is currently filled. <br /> A common tmotice is to Install steel fence posts at the upper and kawe pump-dim navels for earthen impoundments. <br /> While flees approach provides basic infomration on beginning and endir g pump-down,experienca has shown that MM <br /> knowledge is needed.Also,fano poets insmlled in this mann•arc su+jeet to 0amne and tihtplanstnm t A prat <br /> pump-down marker will i the level,or elevation,of manure thAX ghoul the possible range(from imver pump- <br /> down levet to overflow,ors In the lagoon.Experience has shovin that a 6"x 6"Tread arced postpr'oped <br /> imbedded makes a good pump-down marked•.Notches or other I ndicatilts can be carred into the post to show penntent <br /> elevelloos.Painted numbers or colors on the post are not durable emigh to ma Irnakh readability aver a number of <br /> years.Figure 4 shows a type of marker designed to moat the above cr6ria, <br /> I <br /> Fiat"4 � vow"sof 25"at,• <br /> Rump-down marker In an anaerobic lagan. 244Vtsr sem"n(typal? <br /> off S Spiway rtcn�e�uatiai or <br /> normtV <br /> � `.�,Jj;�a •tSelposCatsl�•tlaep <br /> '•. I j <br /> II <br /> Pwmanent markets should be Installed to show the at which paftfnping the lagoon Should b0gin(t fit or more <br /> below full OW level)and the leve)at which pumcinp Should stop.f ate markings,such as at each fool are <br /> desirable to tetter eatanata the volume of affluent in The lagoon.a de$th gage with ma"s every foot or leas from the <br /> design naval to the full pool level can be an aid In determining the screlinohes to be pumped down each time, <br /> Pump-down and land application <br /> Preparation for lagoon pumpoown should start before the lagoon low I reaches the upper pump-down marW to leave <br /> the proper safety volume to contsin a 25 year,24 hour rainfall event bgII&W befofe and during Pump-down is <br /> mcornmrended to annum mettied mMu nrsl achieve marsmum nuvien t recovery.if the lagoon is to be agimtad,a <br /> sample for nedtent Testing should be taken after agitation. <br /> Land applrcaiion is the most desirable method for MSkinp use of the rtutrienia and organic matter lel lagoon effluent. <br /> Sprinkler Irrigation or use of a bactor-mounted applicator�m the oun4nt m of transpkxting <br /> and applying large volumes of I nt. <br /> Uh Kh o use Unified National$trilogy for Animal reading Op"trons,ale desired outaomo to for an esnoentiktse animal <br /> feeding opendlans to develop and implement a comprehensive nutrIcht management pian(CNMP).CNMPs should <br /> h5/21/2009 ub-as.px`--EQ387 5/21/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.