Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street;,Stockton, California 95202-3029 <br /> Telephone:,(209)468=3420 Fax: (209)468-3433 Web:www.sigov.org/ohd/unitiii-html <br /> UNDERGROIL!ND STORAGE TANK (UST) PROGRAM INSPECTION REPORT <br /> Faculty name' Designated Operator: Exp.date: Inspectlon_, <br /> .4 Dat ,t <br /> - � ( �. t�t JK t�� jf«,i�' �},,j✓;`F-3.��Y �1��'��e'�t: ���x <br /> Facility address: _ D' UST#o <br /> Product K r <br /> Facility contact-, I Title: Phone: <br /> Vj <br /> Monito ing paripli Piping system_ erfill prevention: <br /> Y L.-s _ . V.Pressudzed ElSuction LJ Gravity echanical CJ Audible/visual, .c. <br /> Inspection type. Violations: <br /> 5ne fvlanitoring Certifi tion ❑Installation 2 Other: L!M1-RDetect ❑ M2-RPrev ❑M-3 Both <br /> reOn si(we Technicia0i Name: ICC Service Technician Exp.Date: Manufacturer's Training/I: AA 7-, <br /> ,; <br /> # Code Section VIOLATION(S) HSC=Callfornia Health&Safety Code;CCR=Califomia Code of Regulations V R <br /> v=Violation; =Re at Violation V <br /> 1 HSC 25284. Na pe it to operate RV <br /> 2 CCR 2637 Secondlary containment(a)test not performed;(e)test report not submitted within 30 days;(f)test notification not <br /> rovide .to the EHD at least 48 hours prior to conducting the test <br /> 3 CCR 2711(b)&(c) Current Unified Prograrn Consolidated Forms not on file with the EHD.(Faaility and tank form) <br /> 4 HSC 25292.2 Current financial responsibility documents not on file with the EHD <br /> 5 CCR 2632(b) Monitoring Program(Monitoring&Response Plan)is not current or approved by the local agency <br /> 6 CCR 2712(i) Monitor g and/or response plan is not onsite <br /> Maintenance&monitoring records not maintained 3 years,cathodic protection records for 61/2 years, (M1) <br /> written performance claims pertaining to release detection systems for 5 years.or records of repairs,linings,and <br /> 7 CCR 2712(b) upgrades for the life of the tank. Monitoring records include;(1)date and time of all monitoring or sampling; (2) <br /> mcnitori g equipment calibration and maintenance records;(3)results of any visual observations;(4)results of- <br /> sample nalysis performed a lab or in the field;(5)logs of all readings of gauges or other monitoring equipment, <br /> round water elevations,or other test results;(6)results of inventory readings and reconciliations. <br /> 8 CCR 2643(d) Daily monitoring of suction piping(pre-January 1, 1984)not performed <br /> 9 HSC 25292.1 UST system is not operated to prevent unauthorized release,Including spills and overfills <br /> 10 CCR 2632(c)(2) Monitori g system is not presort in the interstitial space of a double walled UST/piping (M1) <br /> 11 CCR 2630(d) UST monitoring equipment is not installed or maintained to detect a leak at the earliest.opportunity (M1) <br /> 12 HSC 25291(b) UST sy em monitoring equipment Is not operational (M1) <br /> 13 CCR 2836(f)(1) Failed 2 maintain a continuous monitoring ystem for underground piping&UDC that to activates an (M1) <br /> audible and visual alarm or stops flow of product at the dispenser when it detects a leak <br /> 14 CCR 2631(a) Primary containment is not product bight <br /> 15 HSC 25291(a)(2) Second ry containment for UST system is not tight <br /> 16 CCR 2636 c(1) All relea es In secondary piping do not flow to a collection sump <br /> 17 HSC 25291 f Line lea detector(s)not installed (M1) <br /> 18 CCR 2635(b)(1) Spill container not installed,failed to contain a minimum capacity of five gallons,or failed to provide (M2) <br /> a means to keep the spill container empty <br /> 19 CCR 2635(b)(2) Overfill prevention system was overridden or failed to meet overfill requirements in this section (M2) <br /> 20 CCR 2636(a) failed to have secondary containment or continuous monitoring(includes conventional suction piping) <br /> 21 HSC 25291 e) Water in °containment not removed,analyzed&properly disposed of <br /> Unautho,ized release that:(c)did not escape secondary containment and cleaned up wltnln eight hours (M1) <br /> 22 GGR 2650 was not recorded; (e)escaped secondary containment,not cleaned up after eight hours,or a sudden loss of <br /> product not reported to the EHD within 24 hours <br /> 23a CCR 2715(a) Failed to Inform the EHD of a change of designated operator within 30 days <br /> 23b CCR 2715(b) Designa d operator did not possess a current ICC UST System Operator certification <br /> Designat d operator monthly inspection:(c)(1)alarms not documented; (c)(2-4)spill containers,UDCs,and <br /> 23c CCR 2715(c), (d),(e) sumps(if necessary)not inspected;(c)(5)required test dates not checked or noted:(c)(6)employee training not <br /> verified; ( e)monthly inspection reports not maintained on site for at least 12 months <br /> 23d CCF 2715(f) Designate�d operator employee training:(1)not performed;(2)not current for at ieset one employee on <br /> log not keipt <br /> EHD INSPECT^, .) RECEIVED rTLE'. <br /> t <br /> EHD 23-02-002 REV 12A& �' Page 1 <br /> UST INSPECTION REPORT <br /> CT/Se 39VJ SJ03JVH HV3-10 ZL9989VGOZ ZZ :ZT 0TOZ,+LO/S0 <br />