My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALL
>
5433
>
2900 - Site Mitigation Program
>
PR0545810
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 4:54:27 PM
Creation date
9/21/2020 4:48:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545810
PE
2960
FACILITY_ID
FA0025925
FACILITY_NAME
BREA AG SERVICE
STREET_NUMBER
5433
STREET_NAME
WALL
STREET_TYPE
RD
City
LINDEN
Zip
95235
CURRENT_STATUS
02
SITE_LOCATION
5433 WALL RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stcete of California Department of Health Services <br /> Memorandum <br /> To Rob Wilson Date April 17 , 1987 <br /> Subject: Sampling Plan <br /> for Brea <br /> Agricultural <br /> Services <br /> From <br /> Pamela Murcel .Bare, CIH <br /> Associate Indu trial Hygienist <br /> Northern California Section <br /> I have reviewed the subject plan for health and safety <br /> considerations. Please find my recommendations for revising <br /> this report detailed below. <br /> There are three required items which were not covered by this <br /> plan: training requirements, medical surveillance program, and <br /> documentation. I have attached a copy of the site safety plan <br /> guidance for your information and for assistance to the <br /> contractor in supplying the additional information. <br /> Specific comments on various portions of the plan are as follows: <br /> Page 3 , Section 5. 3 - How many people are anticipated to be <br /> working at the site? Depending on size of field crew, the PMSSO <br /> may need to be split into two jobs. <br /> Page 4 , Section 5. 4 - Background information needs to include a <br /> summary/table of analytical data to date and some indication of <br /> sampling locations relative to proposed activities. <br /> Page 4 , Section 5. 5 - Needs to include directions to the hospital <br /> and a map. The list of emergency contacts should include a DHS <br /> contact. <br /> Page 4 , Section 5. 5 . 2 - Procedures need to include directions on <br /> emergency decontamination. <br /> Page 6, Section 5 . 6. 2 - Need to add information on dormant spray <br /> oil. <br /> Page 6, Section 5 . 6. 4 - What type of respirator - half-mask or <br /> full-face? Need to add liners (surgical gloves) to list of <br /> equipment. <br /> Page 6, Section 5. 7 - Need to add items on personal hygiene and <br /> respirator use. <br />
The URL can be used to link to this page
Your browser does not support the video tag.