My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALL
>
5433
>
2900 - Site Mitigation Program
>
PR0545810
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 4:54:27 PM
Creation date
9/21/2020 4:48:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545810
PE
2960
FACILITY_ID
FA0025925
FACILITY_NAME
BREA AG SERVICE
STREET_NUMBER
5433
STREET_NAME
WALL
STREET_TYPE
RD
City
LINDEN
Zip
95235
CURRENT_STATUS
02
SITE_LOCATION
5433 WALL RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SfcitV of California Department of Health Services <br /> Memorandum <br /> To Charles A. McLaughlin C, Date : June 16, 1987 <br /> Senior Hazardous <br /> Materials Specialist Subject: BREA AG SERVICE <br /> LINDEN SITE, <br /> SAMPLING PLAN <br /> DATED NOVEMBER <br /> _�\1 13 , 1986, <br /> SAN JOAQUIN <br /> From Robert J. Wilson COUNTY <br /> Associate Hazardous <br /> Materials Specialist <br /> I have reviewed the subject sampling plan. The following concerns <br /> must be addressed: <br /> 1) All of the health and safety concerns raised in the <br /> attached memorandum from Pamela Murcell Bare, must be <br /> addressed, and included with final sampling plan. <br /> 2) The final sampling plan must include a Quality Assurance <br /> /Quality Control (QA/QC) plan. The QA/QC plan must include <br /> both field and laboratory procedures to be used during the <br /> project. Guidance for preparing the QA/QC plan can be found <br /> in the California Site Mitigation Decision Tree document, <br /> dated May 1986. <br /> 3) The final sampling plan must include a site map showing <br /> the locations sampled, and must list each of the <br /> contaminants found, contamination levels, the date (s) <br /> sampled, and all proposed new sampling locations. <br /> 4) Duplicates of all samples must be taken and provided to <br /> the Department. <br /> Attachment <br /> RJW:rjw <br /> rwbrea. 057 <br />
The URL can be used to link to this page
Your browser does not support the video tag.