My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2050
>
2800 - Aboveground Petroleum Storage Program
>
PR0516363
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:48:28 AM
Creation date
9/22/2020 8:04:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0516363
PE
2832
FACILITY_ID
FA0010987
FACILITY_NAME
TEC Equipment
STREET_NUMBER
2050
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
Ave
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
2050 E Louise Ave
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 October 2020 AdvancedGeo <br /> Project No. 20-6092 An Employee-Owned Compony <br /> Page 2 of 20 <br /> of San Joaquin. The Federal agencies enforcing APSA regulations is the United <br /> States Environmental Protection Agency Region 9 Regional Administrator (EPA- <br /> RA). A written spill report must be submitted to all local enforcement agencies <br /> within 60 days if the Facility discharges more than 1,000 gallons of oil into or upon <br /> the navigable waters of the U.S. or adjoining shorelines in a single spill event, or <br /> the Facility discharges oil in quantity greater than 42 gallons (barrel) in each of two <br /> spill events within any 12-month period. Additional information regarding <br /> emergency actions in detailed in Section 6.4 of this Plan. <br /> Plan amendments listed above are referred to as technical amendments and are required <br /> to be certified by a PE. Technical Plan amendments are documented on Table 1. <br /> If any "administrative changes", such as personnel changes or revisions to contact <br /> information, the Plan must be documented in the review log located in Table 1. <br /> Administration changes are made by Facility Management or the designated Coordinator <br /> and are not required to be certified by a PE. <br /> 2.1. SCHEDULED PLAN REVIEWS <br /> In accordance with 40 CFR 112.5, the Facility reviews this Plan at least once every 5 <br /> years. Revisions to the Plan, if needed, are made within six months of the five-year <br /> review. Scheduled reviews and Plan amendments are recorded in the Plan Review Log <br /> (Table 1), even if no amendments are made to the Plan. <br /> Last Plan Review: March 2010 <br /> Current Plan Review: October 2020 <br /> Next Plan Review Scheduled for: October 2025 <br /> 3.0. PLAN ADMINISTRATION AND FACILITY INFORMATION <br /> This section describes non-technical information for this Plan as approved by Facility <br /> management. <br /> 3.1. MANAGEMENT AND DESIGNATED PERSONNEL - 40 CFR 112.7 <br /> Facility management is committed to preventing discharges of oil to navigable waters and <br /> the environment, and to maintaining the highest standards for SPCC through the <br /> implementation and regular review and amendment to this Plan. Additionally, Facility <br /> management has fully approved and committed the necessary resources to implement <br /> the measures described in this Plan. <br /> Administrative Facility management certification is provided on the page located prior to <br /> the table of contents of this Plan. The administrative Facility management certification <br /> page also indicates Facility personnel accountable for SPCC at the Facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.