Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> - -- - - -- --- - - - ---- - -- - - -- - -- -- - - - - - - - - - ---- ---- --, <br /> sae address: i SYSTEM TRANSPORT 707 E. ROTH ROAD FRENCH CAMP CA 95231 <br /> . . . - - - - - - . . . . . . ATC I UDUS80P OFFICE �► <br /> DIESEL N . . <br /> . . - <br /> . 0111 . . . . . . . <br /> 0000 . . . <br /> . <br /> I M I - <br /> S <br /> . - 0000I - SAT 2. . . . . <br /> _ <br /> _ _ - <br /> . 2. t KEY <br /> A =AN.NnAR <br /> *PIPLNG } F = FILLS <br /> (.1RROTL S) T = TL'RBLNE <br /> Draveine of pipi»e P = PROBE <br /> it of sump and SAT 1 . _ - - �' =Cr1POR <br /> exit of No Y = STAIP SENSOR <br /> underground L = Leak Detector <br /> drai�ia is Af = Afannay <br /> draw IL: is . . . . . . _ B = Brine Sensor <br /> rgsucannot speculate I = Smart Sensor <br /> blue prints. Any items underground that are not visible to the certifying technician are a S = STP <br /> i professional opinion only and are solely for infomufional purposes. Drawing not to C =Floats At Cliains <br /> i/t✓ -'� scale. E = E Stop <br /> Date map was drawn:511119. <br /> Instructions <br /> If you already have a diagram that shows all required information. you may include it. rather than this page, with your Monitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Clearly identify locaf'or s of the following equipment, f installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak deteabon). In the space provided, note the date_ this Sile Plan was prepared. <br /> LEGEND <br />