My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
9/22/2020 1:29:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL INSTRUCTIONS <br /> Normal Operation: A Hose"Kick"and reduced flow <br /> The OPW 61 SO Overfill Prevention Valve is signal that the tank is full. Close transport delivery <br /> designed for tight fill, gravity drop applications to valve and drain hose into tank before disconnecting <br /> help prevent accidental or intentional overfilling of any hose fitting. <br /> underground storage tanks. It is installed in the UST <br /> drop tube in place of a standard drop tube. Overfilled Tank: Failure of the hose to drain after <br /> The main 61 SO valve closes when liquid level is at closing the delivery valve signals an overfilled tank. <br /> 95%of the top of the tank. A small bypass valve Do Not Disconnect any delivery hose fitting until the <br /> remains open to allow the delivery hose to drain at liquid level in the tank has been lowered to allow the <br /> 3-5 gallons per minute. If the delivery truck valve is hose to drain into the tank. Attention: In the event <br /> not closed after initial shut-off, the bypass valve will you are splashed, remove all wetted clothing <br /> close and will restrict all fuel delivery. immediately. Do not go into an enclosed area and <br /> stay away from ignition sources. <br /> The 61 SO EVR approved models of the 61 SO are <br /> designed to be installed with the following OPW IMPORTANT <br /> products: Face Seal Adapter, Spill Container or Determine if the underground storage tank is <br /> Multi-port, Jack Screw Kit, Rotatable Product equipped with a ball float vent valve,as <br /> Adaptor, and Product Cap. illustrated in Figure 16. In all systems,the shut- <br /> off point of the 61 SO must be reached before the <br /> IMPORTANT ball float reduces flow to ensure proper overfill <br /> Read these assembly and installation instructions valve operation. <br /> completely and carefully prior to starting. Check to <br /> make sure all parts have been provided. Use only <br /> the parts supplied; substitution of parts may cause TOOLS NEEDED FOR INSTALLATION AND <br /> product failure. ASSEMBLY: <br /> 1. Drill <br /> Failure to follow instructions may cause improper 2. A sharp 1/8"pilot drill bit <br /> product operation or premature failure which may 3. A sharp 5/16"drill bit <br /> permit storage tank overfill. An overfilled storage 4. Tape measure <br /> tank may create hazardous conditions and/or 5. Hacksaw or cut-off saw, fine tooth; 24 teeth/inch <br /> environmental contamination. 6. Fine half round file <br /> 7. Screwdriver-Phillips blade <br /> CAUTION 8. '/z"Wrench or socket <br /> Do not remove elastic band from around float until 9. Two-part sealant(Supplied) <br /> instructed to do so, as damage to valve may result. 10. Torque Wrench <br /> WARNING WARNING <br /> Failure to properly connect delivery hose and elbow, Using electrically operated equipment near gasoline <br /> and/or disconnecting a liquid filled delivery hose or or gasoline vapors may result in fire or explosion, <br /> elbow will result in a hazardous spill, which may causing personal injury and property damage. <br /> result in personal injury, property damage, fire, Check to assure the working area is free from such <br /> explosion, and water and soil pollution. hazards, and always use proper precautions. <br /> ` Make sure all connections, including the hose <br /> and elbow connections, between storage tank IMPORTANT: The figures in this installation and <br /> and transport are securely coupled. maintenance instruction may contain vapor recovery <br /> • Make sure the lip seal and/or all gaskets in the equipment(including model numbers)that is not <br /> delivery elbow are properly in place to prevent certified by the California Air Resources Board <br /> spills. (CARB)for a specific Phase I Vapor Recovery <br /> • Do not operate with damaged or missing parts, System. Please refer to Exhibit 1 of the appropriate <br /> which prevent tight connections. CARB Phase I Executive Order for a list of certified <br /> Phase I Vapor Recovery System Equipment. <br /> 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.