Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM <br /> Type of Action ❑ Installation Test ❑ Repair Test ❑o 12 Month Test <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 10182167 01 /04/2019 <br /> Business Name (Same as Facility Name or DBA-Doing Business As.) <br /> VALLEY PACIFIC HWY 99 CARDLOCK <br /> Business Site Address City ZIP Code <br /> 3550 S HWY 99 Stockton 95215 <br /> II , UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Phone # <br /> Garrett Warren 1 ( 916) 991 - 1100 <br /> Contractor/Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> CSLB#803616 SWRB#06 - 1672 8185019 10-2-2019 <br /> Spill Container Testing Training and Certifications (List applicable certifications.) <br /> OPW EVR 101018 exp . & 9 -2019 <br /> III . SPILL CONTAINER TESTING INFORMATION <br /> Test Method <br /> Used : El Manufacturer Guidelines: <br /> (Specify) <br /> X Industry Code or Engineering Standard : RP 1200 <br /> (Specify) <br /> ❑ Engineered Method : <br /> (Specify) <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Tank ID : (By tank number, stored product, etc.) T1 : Unleaded rT2 : DFR <br /> Spill Container Manufacturer: OPWOPW <br /> M Non -Metallic Non -Metallic 171Non-Metallic E] Non -Metallic <br /> Method of Cathodic ProtectionIsolation Isolation El isolation ElIsolation <br /> ❑ Other ❑ Other ❑ Other ❑ Other <br /> j (Specify in section V.) (Specify in section V.) (Specify in section V.) (Specify in section V.) <br /> Inside Diameter of Spill Container: (Inches) <br /> I <br /> Depth of Spill Container: (Inches) 12 . 25° 12 <br /> Does the spill container have a 5 gallon 0 Yes ❑ No El Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> ca acit ? <br /> X Drain Valve N Drain Valve ❑ Drain Valve ❑ Drain Valve <br /> Method to Keep Spill Container Empty 171Onsite Pump 171Onsite Pump [IOnsite Pump ElOnsite Pump <br /> ❑ Other El Other <br /> ❑ Other ❑ Other <br /> (Specify in section V) (Specify in section V.) (Specify in section V.) (Specify in section V.) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results X Pass ❑ Fail ❑ Pass Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> All items marked "Fail' above must be explained in this section. Any additional comments may also be provided here. <br /> Diesel spill bucket failed . Bucket spun on the OPI Inspection prior to this testing day. Bucket will have to be replaced . <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the spill containers were tested in accordance with California Code of Regulations, title 23, division 3 , chapter 16, section <br /> 2637. 1 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> 4 <br /> If the facility has more components than th ' form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground storage tank, ICC = International Code Council <br />