My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 4:37:47 PM
Creation date
9/22/2020 1:43:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0505867
PE
2361
FACILITY_ID
FA0007059
FACILITY_NAME
H&S Energy Products,#3035
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
192 Lathrop Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6) <br /> VIII . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational ? ❑X ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, ❑ ❑ <br /> functionally tested , and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with n ❑ ❑ <br /> their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings ? ❑X ❑ ❑ <br /> Was the monitoring panel' s backup battery visually inspected , functionally tested , and confirmed operational? 0 ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? X❑ ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically X El ❑ <br /> disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? 0 El ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) XSump [gUnder-DispenserContainment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e .g . , modem) operational? ❑ ❑ ❑X <br /> For any answer of "M' above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN -TANK GAUGING TESTING <br /> ❑X Check this box if tank gauging is used only for inventory control . (Do not complete this section) <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for ❑ ❑ ❑ <br /> round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally ❑ ❑ ❑ <br /> tested , and confirmed operational? <br /> Was accuracy of system's product level readings tested ? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ H ElWere all probes reinstalled properly? ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ I ❑ ❑ <br /> For any answer of "M' above, describe in Section XI how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> Y = Yes, N = No, NA = Not Applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.