My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 11:25:17 AM
Creation date
9/22/2020 2:57:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mast <br /> A� a ndix B <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are In inches. Please contact the Authority. Having .Jt(risdic- <br /> tion (AHJ) and review local, state, and national •codes to determine the regulatory requirements governing <br /> shut-off cep4city in your region, as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body (see figures), upper tube length . <br /> Note: the Upper Tube Length must be at least 16" to in- � <br /> clude the protective bend in the tube . <br /> Sam <br /> Distance from the 7150 inlet tube flange to the top and <br /> bottom of lower tube, valve length . (D) <br /> (W) _ 6 Upper <br /> (U ) <br /> Whom <br /> Tube <br /> Distance from the 71 SO inlet tube flange to the bottom •• 1 • ••• •- -1111• so is <br /> of the tank. Note: if a tank bottom protector is present it s <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 & 61 TP models add 0.61 QAsk son, (W) ValveRow <br /> (g) _ �Ii " (� M Length, to <br /> bottom of <br /> cut <br /> From the tank calibration chart provided by tank manu- <br /> \ M <br /> facturer find the dipstick number (Y) which corresponds <br /> to the 100% volume. To Tank <br /> (B) <br /> — • � (Y) <br /> 1 . To determine shut-off percentage: Tank <br /> Subtract upper tube length (D) from distance to tank (U) Valve _. _ Chart <br /> bottom (B) Length, 100% <br /> (X) _ (g) „ (p) - 2„ _ p ►1Z - ,�3 /y -Z = / 0S top of cut Volume <br /> -- Dipstick <br /> On <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X) dimension and the 100% volume (Y) tank <br /> capacity. c' ... <br /> (X) tank capacity In gallons = a <br /> .(Y) tank capacity in gallons = <br /> I � X03 • ' , : . .. . . . .:_..:.�.-.,.. . . . , . .. . . _ . . . .. <br /> SO% = (X) capacity / (Y) capacity x100 = 9 `�' �-� Mote: The overfill valve must be Installed per AHJ require- <br /> ments and all applicable local, state, and national codes , If <br /> 19669 the overfill valve is set above the allowable shut-off percent- <br /> x 1 oo � g y . � 5 age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br />
The URL can be used to link to this page
Your browser does not support the video tag.