Laserfiche WebLink
Spill Bucket Testing Report <br /> 1 . FACILITY INFORMATION <br /> Facility Name : MAIN STREET ARCO AM PM Date of Testing : 11 /26/2019 <br /> Facility Address : 1 100 S Main St Manteca, CA 95337 <br /> Facility Contact : Jesse Phone : (209) 609-0117 <br /> 2 . TESTING CONTRACTOR INFORMATION <br /> Company Name : Diamond Petroleum Services, Inc. <br /> Technician Conducting Test: Guadalupe Sanchez <br /> Contractor License # 1005444 ICC Certification # 5250451 <br /> 3 . SPILL BUCKET TESTING INFORMATION <br /> Test Method Used : Hydrostatic <br /> Test Equipment Used : Standard Tape Measure Equipment Resolution : 1 / 16" <br /> Identify Spill Bucket (!3), Tank T2 : 91 Fill <br /> Nwnber, Stored Product, etc. <br /> Bucket Installation Type : Direct Bury Direct Bury Direct Bury Direct Bury <br /> x Contained in Sump Contained in Sump Contained in Stinip Contained in Sum <br /> Bucket Inside Diameter : I I " <br /> Bucket Depth : 15 %" <br /> Wait time between applying 5 minutes <br /> vacutim %water and start of test: <br /> Test Start Time (Ti) : 2 : 19 p .m . <br /> Initial Reading (Ri) : 1 1 3/111 <br /> Test End Time (Tr) : 3 : 19 p. m . <br /> Final Reading (Rr) : 11 '/a" <br /> Test Duration (Tr — Ti) : 1 hr <br /> Change in Reading (Rr - Ri ) : 0 <br /> Pass/Fail Threshold or 1 /8„ <br /> Criteria: <br /> Test Result: x Pass Fail Pass ❑ Fail Pass Fail Pass Fail <br /> Comments : <br /> Date : 11 /26/2019 <br /> Technician ' s Signahn,c: <br /> i <br />