My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 11:25:17 AM
Creation date
9/22/2020 2:57:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 25 : INSTALL WARNING PLATE <br /> Bend the three warning plate ears down then slide the <br /> tie wrap over the warning plate ears and position warn - <br /> ing plate against riser pipe approximately 1 " below the <br /> adaptor . Tighten the tie wrap securely. The valve is <br /> now fully installed and in operating position . <br /> 0 <br /> NOTE : the warning plate includes important warn - <br /> ings, operating parameters, and listing information pP q <br /> A <br /> must be installed . <br /> / 15P <br /> 54 <br /> ft`CIO <br /> 00 p <br /> .f <br /> ° Manufacturer : " OPW" <br /> Model : '71 S &4" <br /> (4" represents size) <br /> Manufacture Date . <br /> " MFG MMYY" <br /> MM= Month YY= Year <br /> Warning <br /> Plate <br /> Figure 26 - Product Identification <br /> Figure 25 <br /> STEP 26 : VALVE REMOVAL <br /> The valve can be removed for tank leak testing , inspec- <br /> tion , etc ., by removing the Rotatable Product Adaptor, <br /> the 4" nipple, and the Jack Screw Kit . Reinstall per the <br /> above instructions . <br /> For testable models only : It is not necessary to re- <br /> move the valve to check poppet movement / function . <br /> See Page 17 for full testing details . <br /> STEP 27 : ELECTRONIC LIQUID LEVEL MONITORING <br /> If an electronic level monitor is installed , it must be cali- <br /> brated to match the top of the 71 SO valve body, which <br /> must correlate with 95 % of the actual tank capacity. <br /> I <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.