My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 9:05:30 AM
Creation date
9/22/2020 3:15:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans &applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NO [] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Remove existing dispensers,Install 6 new dispensers with Bravo conversion frames-possible cold start <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> (6)CONV-8200 <br /> (6)Gilbarco 700s <br /> EH23CO38(revised 12-11-15) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.