Laserfiche WebLink
Spill Bucket Testing Report <br /> 1. FACILITY INFORMATION <br /> Facility Name: ARCO AM PM# 82602 Date of Testing: 10/17/2019 <br /> Facility Address: 2430 Joe Pombo Pkwy Tracy,CA 95376 <br /> Facility Contact: Vikram Phone: (209)247-6061 <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Diamond Petroleum Services, Inc. <br /> Technician Conducting Test: Guadalupe Sanchez <br /> Contractor License# 1005444 ICC Certification#5250451 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: Hydrostatic <br /> Test Equipment Used: Standard Tape Measure Equipment Resolution: 1/16" <br /> Identify Spill Bucket(By Tank Tl: 87 M West Fill Tl: 87 M East Fill T2: 87 Syphon Fill T3: 91 Fill <br /> Number,Stored Product, etc. <br /> Bucket Installation Type: Direct Bury Direct Bury Direct Bury Direct Bury <br /> x Contained in Sump x Contained in Sump x Contained in Sump x Contained in Sum <br /> Bucket Inside Diameter: 11" 11" 11" 1 I" <br /> Bucket Depth: 161/2" 17" 16 3/8" 16'/<" <br /> Wah time between-applying 5 minutes 5 minutes 5 minutes 5 minutes <br /> vacuunv%water and start of test: <br /> Test Start Time(Ti): 9:32 a.m. 9:32 a.m. 9:31 a.m. 9:32 a.m. <br /> Initial Reading(Ri): 131/4" 131/4" 131/4" 12'/." <br /> Test End Time(TF): 10:32 a.m. 10:32 a.m. 10:31 a.m. 10:32 a.m. <br /> Final Reading(RF): 131/4" 13 V 131/4" 123/4 <br /> Test Duration(TF—Ti): 1 hr 1 hr I hr 1 hr <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or 1/8" 1/8" 1/8" 1/8" <br /> Criteria: <br /> Test Result: x Pass ❑Fail x Pass ❑Fail x Pass ❑Fail x Pass ❑Fail <br /> Comments: <br /> Technician's Signa �� �.� � Date: 10/17/2019 <br />