Laserfiche WebLink
Spill Bucket Testing Report <br /> 1. FACILITY INFORMATION <br /> Facility Name: ARCO AM PM # 82602 Date of Testing: 10/ 17/2018 <br /> Facility Address: 2430 Joe Pombo Pkwy. Tracy, CA 95376 <br /> Facility Contact: Vikram Phone: (209) 247-6061 <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Com any Name: Diamond Petroleum Services, Inc. <br /> Technician Conducting Test: Guadalupe Sanchez <br /> Contractor License # 1005444 ICC Certification # 5250451 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: Hydrostatic <br /> Test Equipment Used: Standard Tape Measure Equipment Resolution: 1 / 16" <br /> Identify Spill Bucket (By Tank Tl : 87 M West Fill T1 : 87 M East Fill T2: 87 Syphon T3: 91 Fill <br /> Number, Stored Product, etc. <br /> Bucket Installation Type: Direct Bury Direct Bury Direct Bury Direct Bury <br /> x Contained in Sump x Contained in Sump x Contained in Sump x Contained in Sum <br /> Bucket Inside Diameter: <br /> Bucket Depth: 16 '/2" 17 161 /8 17" <br /> Wait time between applying 5 minutes 5 minutes 5 minutes 5 minutes <br /> vacuum/water and start of test : <br /> Test Start Time (TI): 12:31 p.m. 12 : 31 p.m. 12: 31 p.m. 12 :31 p.m. <br /> Initial Reading (RI): 15" 15 5/8" 14 5/8" 15 5/8" <br /> Test End Time (TF): 1 :3 l p.m. 1 :31 p.m. 1 :31 p.m. 1 :31 p.m. <br /> Final Reading (RF): 15 15 5/8" 145/8 155/8 <br /> Test Duration (TF — TI): 1 his 1 hr I his I his <br /> Change in Reading (RF - RI): 0 0 0 0 <br /> Pass/Fall Threshold or 1 /8» 1 /8" 1 /8" 1 /8" <br /> Criteria: <br /> Test Result: x Pass ❑ Fail x Pass ❑ Fail x Pass 0 Fail x Pass ❑ Fail <br /> Comments : <br /> Technician's Signature:- Date: 10/ 17/2018 <br />