Laserfiche WebLink
applicant shall construct the fence in accordance with the approved plans. <br /> E. The project applicant will be responsible for submitting a letter of <br /> completion to the Kern County Planning Department regarding <br /> installation of the barbed wire fence around the permit area including <br /> installation of the hardware cloth. <br /> F. The project applicant will implement a 15 mile per hour speed limit on all <br /> non-public roads within the permit area. Signs shall be posted, and <br /> employee training shall be conducted to this effect. <br /> G. The project applicant will be responsible for implementing the initial <br /> awareness training program for all employees including advising <br /> contractors to be aware of the potential presence of listed species and to <br /> take every precaution to avoid any adverse impacts. Training logs will be <br /> kept on file at the H.M. Holloway Gypsum Mine office and will available <br /> for review/verification u on request. <br /> #9 MM 4.2-2. Prior to the installation of fencing, all Prior to construction of the Kern County Planning <br /> 4.2-1 potential kit fox dens as identified in the biological perimeter boundary fencing. Department <br /> reconnaissance report will be monitored and excavated <br /> per "USFWS Standardized Recommendations for the <br /> Protection of San Joaquin Kit Fox Prior to or During <br /> Ground Disturbance" (Standardized Recommendations) <br /> (USFWS 1999). Six potential kit fox dens were <br /> observed in the additional marshalling and stockpiling <br /> area (see Figure 4.2-2). If the status of any of the <br /> identified potential kit fox dens changes to "known" or <br /> "suspected pupping" den, the appropriate buffer as <br /> described in the Standardized Recommendations will <br /> be established around any such den and the USFWS <br /> and CDFG will be contacted for further guidance prior <br /> to fencing the site. No excavation or other disturbance <br /> of known or suspected pupping dens should occur <br /> without contacting USFWS and CDFG and obtaining <br /> the appropriate permits. <br /> Steps to Compliance: <br /> 9 <br /> Final Board of Supervisors 3/15/16 <br /> I <br />