Laserfiche WebLink
contacted to evaluate the find in conformance <br /> with 15064.5 of CEQA. <br /> Steps to Compliance: <br /> A. This measure will be. included as a condition of approval in the CUP. <br /> The project applicant shall include these requirements in project plans <br /> and specifications, and environmental awareness training used by <br /> operations staff and contractors. <br /> Justification: The Project has the potential to impact cultural resources during Project operations. Changes in or alterations have been incorporated <br /> into the Project that substantially lessen the potentially significant effects as identified in the Final ETR, so that environmental effects after such <br /> mitigation are reduced to a less than significant level. <br /> :xy <br /> N <br /> :t <br /> F, - <br /> {r•.::�.Vii:'•.. 'rY'�.i i•..':,^ <br /> °�Ha ard�':Artcf:Ha�ardo �s, _ <br /> - ..��-:�� .=���,� :;:x=-;;,F-=-� .":::.:< .;;:•• _"� ,.fir <br /> 91.2 MM 4.5-1. All hazardous materials such as diesel fuel, During Project operations Environmental Health <br /> 4.5-1 oils, lubricants, and hydraulic fluids shall be stored permitted by planning Services Department <br /> properly and Material Safety Data Sheets shall be on approvals. <br /> site. Hazardous waste shall be managed properly. <br /> Training shall be provided to all personnel involved in <br /> handling of hazardous materials/waste. <br /> Steps to Compliance: <br /> A. Inspections and mouito ing would be conducted by the EHSD. <br /> #13 MM. 4.5-2. All wastes (dewatered Class A and B Prior to commencement of Environmental Health <br /> 4,5_2 biosolids, spent sandblast media, cogeneration ash (fly operations permitted by Services Department <br /> ash), treated auto shredder waste and lime filter cake) planning approvals, and Regional Water Quality <br /> shall be evaluated prior to receipt to ensure that only during subsequent operations. Control Board(RWQCB) <br /> non-hazardous waste is accepted at the proposed <br /> facility. In the case of any hazardous waste detection, <br /> during either normal testing procedures or special <br /> checking of loads, the following procedures will be <br /> strictly adhered to in order to minimize contamination: <br /> a) Immediately after discovery of the contaminated <br /> material, all key personnel will be properly dressed and <br /> 13 <br /> Final Board of Supervisors 3115118 <br />