Laserfiche WebLink
Application for the Beneficial Reuse <br /> of Fly,Ash or Bottom Ash <br /> Aoplicant Information <br /> Company/Facility Diversified 4inerals Inc. (DMI) / Holloway Environmental Solutions <br /> Name- LLC. Lost Hillis Facility(Holloway) <br /> Company/Facility Owner <br /> Name Holloway Environmental Solutions LLC. <br /> Address 2019 Westwind Dr.Suite B,Bakersfield CA.93301 <br /> Phone 661-758-6484 <br /> Mailing Address/ Site Address: <br /> Physical Address of 14045 Holloway Road, Lost Hills, California,93249 <br /> Company/Facility(if <br /> different) <br /> 1)Type of material to be M Fly ash <br /> used (check one): ❑ Bottom ash <br /> ® Both <br /> 2)Describe the application N Moisture Absorbent Reagent <br /> of the ash(check all that ❑ Bulking Material <br /> apply): ❑ Road base or sub base material <br /> ® Landfill Alternate Daily Cover/Construction Material <br /> Other Please Describe):Alkaline stabilization of Bio-Solids <br /> 3) Describe the El Stand alone—covered with another material <br /> use/mixture of the ash ❑ Aggregate with concrete <br /> (check all that apply): ❑ Aggregate with road base material <br /> ® Mix with other fill material <br /> ❑ Encapsulate within another material <br /> ❑ Mixed with other materials in a manufacturing <br /> process <br /> 4) Is there a surface body F1 Yes <br /> of water near the facility? No <br /> 4A) If Yes, distance from <br /> facili . <br /> 5) Is there a potential for Yes <br /> runoff from the storage of ® No <br /> the ash material into the <br /> body of water? <br /> 5A) Is there a storm water El Yes <br /> General Permit for the ® No <br /> site?cA water code Section <br /> 13260-13275, CCR Title 23,Div. <br /> 3 Chapter 9 <br /> 6) Describe the storage Ash is directly placed on top of Bio-Solids and incorporated. <br /> plan for the ash received. <br /> 6A) Describe containment process: Ash is unloaded from end-dump or pneumatic trailers using <br /> special practices to avoid excessive dust. If needed additional portable systems can be place at <br /> site. <br /> 7) Describe the quality Screened for sizing <br /> requirement of the bottom ❑ Foreign materials and metal removed <br /> ash. ❑ Other: <br /> 8) Describe the amount of ash Tons/Loads All ash loads available <br /> requested and duration of <br /> deliveries. Start Date February 12 2018 <br /> Duration 5 years with extensions <br />