My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
9/23/2020 8:40:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets. of plans & applications as originals. will be retained by. EHU) <br /> 1 , Site map enclosed? YI_SF�j NO M <br /> 2 . Submit copies of ICC Service Technician andfor instalier's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the "Site Health :and Safety <br /> Plan " is available on the jobsite as required by Title 8. <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach kA diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component, describe how this will be done.. (If <br /> addino piping , t1DC's, or other LIST equipment, or performing tank top upgrade, use the. UST Installation Application <br /> pages 4 8 as necessary for a timely plan review): <br /> replace drop tube with overfill prevention device on all tanks (3 ) <br /> replace 3.5 gallon fill buckets with 5 .0 gallon buckets <br /> no excavation required <br /> 4 , List of equipment to be used (Attach manufacturer's specification sheets showing third=party approval): <br /> I <br /> Franklin Fueling Defender Series XXXX- 1922 <br /> E <br /> I Phil-tite 85100 series fill buckets (5 gallons) <br /> i <br /> pl <br /> 1 <br /> 1 _ <br /> a <br /> i <br /> 2 <br /> , <br /> I g , iN = r <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.