Laserfiche WebLink
SPCC Plan:Ralph Hayes&San,Inc., 20177 S.McArthur Dr., Tracy,California(October 2020) 13 <br /> Response Center (1-800-4248802), which is staffed 24 hours a day. A summary sheet is <br /> included in Appendix E to facilitate reporting. <br /> All spills greater than one (1) gallon are required to be reported internally to the facility <br /> manager. In addition, 40 CFR 112.4 requires that whenever a facility discharges more than <br /> 1,000 gallons of oil in, a single event or discharges more than 42 gallons of oil in each of two <br /> discharge events within a I2-month period, the facility must inform the United States <br /> Environmental Protection Agency and the appropriate state agency (San Joaquin County <br /> Environmental Health Department)in charge of oil pollution control activities. <br /> 4. PREDICTION OF SPILL CHARACTERISTICS (REF. 112.7(b)) <br /> Where experience indicates a reasonable potential for equipment failure (such as during <br /> loading or unloading equipment,tank overflow,rupture, leakage,or human error),a prediction <br /> of the direction, rate of flow, and total quantity of oil which could be discharged from the <br /> facility as a result of each type of major equipment failure shall be provided. Surface flow <br /> patterns proximal to the ASTs are indicated in the Figures, <br /> RHS management does not believe that there is a reasonable potential for equipment failure <br /> such as tank overflow, rupture, or leakage. However, Table 5 presents spill scenarios which <br /> are considered to be "most likely" (although not necessarily probable) predictions of the oil <br /> spill events for each area storing oil in bulk containers greater than or equal to 55-gallons in <br /> capacity. <br /> Table 5: Potential Discharge Volumes and Direction of Flow <br /> Potential went Maximum Volume Maximum Direction of Flow Secondary Containment:: <br /> ;; Released,,(gallons}, Discharge Rat® <br /> Bulk Containment Structure(Tanks 1-4,Drums) <br /> Would likely remain within the <br /> secondary containment structure. <br /> Gradual to If the containment stntctttrc was <br /> Failure of AST 5C,5-10,000 also damaged,the oil would likely Sized secondary containment <br /> instantaneous travel towards the central portion structure <br /> Of the gravel-covewd yard and <br /> remain onsite. <br /> Tank Overfill 5 30 gallmin Would likely remain within the Sized secondary contninment <br /> secondary containment structure. structure <br /> Dispenser Hose Departure 5 5al/min Would likely remain next to the <br /> g containment Structure Sorbent materials <br /> Warehouse(Wanks 5-7) <br /> Gradual to Would likely remain within the <br /> Failure of AST l 10-1�5 <br /> instantaneous warehouse structure or next to the Double-walled tank <br /> _Ioadinv door <br /> Would likely remain within the <br /> Tank Overfill 5 30 gal/min warehouse structure or next to the Interior warehouse and sorbcnt <br /> loadin door materials <br /> 5. CONTAINMENT AND DIVERSIONARY STRUCTURES (REF. 112.7 <br /> (c)) <br /> Methods of secondary containment and diversionary structures at this facility include a <br /> combination of structures (e.g., sized secondary containment structures)as well as active spill <br /> response (e,g., sorbents, etc.) to prevent oil from reaching navigable waters and adjoining <br /> shorelines. The secondary containment systems of the facility are sufficiently impervious to <br /> McGinley Project:RHS001 McGinley&Associates Inc. <br />