Laserfiche WebLink
SWRCB , January 2002 Page 2 of 2 <br /> 5 . SECONDARY PIPE TESTING <br /> Test Method Developed By : r Piping Manufacturer Industry Standard Professional Engineer <br /> Other (Specify) <br /> Test Method Used By : F Pressure F7, Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used : gauge Equipment Resolution : .20 <br /> (Tank T6 PUL - (Tank T6 PUL - <br /> PREMIUM) STP PREMIUM) STP <br /> Containment I to 1/2 Containment ' I to 7/8 <br /> Piping Material : 3/4, 5/6 9/10511/12 <br /> Piping Manufacturer : dw flex dw flex <br /> Piping Diameter: envrion envrion in. in. <br /> Length of Piping Run : 2 in. 2 in. fl It <br /> Product Stored : 110 ft. 110 ft. <br /> Method and location of PREMIUM PREMIUM <br /> i in -run isolation : <br /> Wait time between applying <br /> sump sump <br /> pressure/vacuum/water and min min <br /> starting test : 15 min 15 min <br /> Test Start Time : <br /> Initial Reading (Rj): 10:35:00 10:35 :00 <br /> Test End Time : 5 .00000 PSI 5.00000 PSI <br /> Final Reading (RF): 11 :35 :00 11 :35:00 <br /> Test Duration : 5 .00000 PSI 5.00000 PSI <br /> Change in Reading (RF-Rj): 1 hr 2 hr <br /> Pass/Fail Threshold or 0.00000 PSI 0.00000 PSI <br /> Criteria: +/- 0. 00000 +/- 0.00000 <br /> Test Result : <br /> Pass Pass <br /> Comments - (include information on repairs made prior to testing, and recommended folloNi-up for• failed tests) <br /> WO : 2339733 <br />