Laserfiche WebLink
W . O . # NW1 - 2339733 <br /> UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 1 of 6) <br /> Type of Action ❑ Installation Test ❑ Repair Test ❑ Six Month Test El 36 Month Test <br /> i. FACILITY INFORMATION <br /> CERS ID Date of Secondary Containment Test <br /> 10166021 12-21 -18 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> 7- 11 <br /> Business Site Address City ZIP Code <br /> 2360 w, grantline trnr 95356 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Phone # <br /> jarrod Cooke (209)321 - 2724 Ext. <br /> Contractor/Tank Tester license # ICC Certification # ICC Certification Expiration Date <br /> 743160 8155550 4-6-19 <br /> III. SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br /> Tank ID: (By tank number, stored product, etc.) A reg B Sup C mul D <br /> Tank Containment <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Product Piping Containment <br /> Tightness Test Result ® Pass ❑ Fail ❑ NA ® Pass ❑ Fail ❑ NA ® Pass ❑ Fail ❑ NA ® Pass ❑ Fail ❑ NA <br /> Communication Test Result (0 Pass ❑ Fail ❑ NA I] Pass ❑ Fail ❑ NA ® Pass ❑ Fail ❑ NA ® Pass El Tail [INA <br /> Remote Fill Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fait ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Vent Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Vapor Recovery Piping Containment <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Communication Test Result ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Turbine / Product Piping Sump <br /> Tightness Test Result REIFa Fail ❑ NA ❑ Pass [:] Fall ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Fill Riser Sump <br /> Tightness Test Result Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Vent I Transition Sump ID: b C d <br /> Tightness Test Result Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Faii ❑ NAuDCID: 23/4 35/6 7/8 <br /> Tightness Test Result ail ❑ NA ® Pass ❑ Fail ❑ NA ID Pass ❑ Fail ❑ NA E) Pass ❑ Fail ❑ NA <br /> UDC ID: 611 /12 7 8 <br /> Tightness Test Result ail ❑ NA ® Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> uDc lo: 10 11 12 <br /> Tightness Test Result ❑ Pass ❑ Fail ❑ NA 10 Pass ❑ Fall ❑ NA ID Pass ❑ Fail ❑ NA 111 Pass ❑ Fail ❑ NA <br /> All items marked "Fail' or "N/A " must be explained In their respective "COMMENTS" section. <br /> IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the secondary containment was tested in accordance with Califomia Code of Regulations, title 23, <br /> division 3, chapter 16, section 2637 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground storage tank, ICC = International Code Council, <br /> NA = Not applicable, UDC = Under-dispenser containment <br /> AN 0 9 2019 <br /> A L <br /> - <br /> t <br />