Laserfiche WebLink
aU!N GZ SAN J OAQ U I N Environmental Health Department <br /> ON CQ . <br /> " lt` ; COUNTY Linda Turkatte , REHS , Director <br /> Kasey Foley, REHS, Assistant Director <br /> mc, <br /> kiFoa?`¢ Greatness grows here . PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Michael Kith , REHS <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> March 27 , 2019 , <br /> GREG HOHN <br /> CHEVRON <br /> PO BOX 2292 <br /> BREA , CA 92822 <br /> Re : CHEVRON STATION # 1731 * <br /> 3355 E HAMMER LN SR0080372 <br /> STOCKTON , CA 95212 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of <br /> the application for a permit to replace the 87 gasoline and 91 premium unleaded direct- bury spill <br /> containers with Franklin Fueling System ( FFS : 85000 - 1 ) spill containers with drain valve on the <br /> underground storage tank ( UST) system at the above noted address . The permit has been <br /> approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for <br /> approval prior to commencing work . All new addenda supersede the previous <br /> ones . <br /> 3 . Contact Elena Manzo at (209 ) 953 -7699 to arrange the following appointments ( a <br /> 4 & hour notice is required for inspection appointments ) . <br /> • Spill bucket test : Verify minimum 5 -gallon capacity and pass a one hour hydrostatic <br /> test (or equivalent) . Proper drainage must also be verified . <br /> • Corrosion protection : Verify corrosion protection for direct bury spill bucket prior to <br /> backfilling . <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> N <br /> nspection and approval . <br /> 4 . Since concrete will be broken near the 87 and 91 tanks , a secondary containment test <br /> must be performed on these tanks once concrete is poured in accordance with the <br /> manufacturer' s guidelines . <br /> 5 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br />