Laserfiche WebLink
3.3 Equipment Installation Instructions <br />Chlorinator Assembly <br />Below Grade Red 114"V <br />Booster Pump — _ _ Tubing - <br />1 Shut.ox Chlorinator Solenoid control I 112" Poly Turing <br />1" Poly Hose LIve _Feeder Valve Va J Diluted 4:1 <br />Pool #1 Suction --- — Muriatic Add <br />(Skimmers, etc.) trdII THa^ <br />r,p 111 NPi, <br />VP M1PT [ 1R' i (Wba) <br />n 711V <br />1" Poly _1ijiotor <br />tp <br />T Hose 114 MPT. <br />VMPT <br />wap Pump <br />Return <br />STRAINER y y <br />HEATER t0 P00l #1 <br />MAIN PUMP <br />FILTER <br />Predrill bled' <br />rat^Serial¢Tee. dinatabin Trip UdurHP <br />'-Spgt[LCF"T. g ep Ty. i <br />WC MPT x V BrE Saddle Tee is not 314"ANPTx 1'xrb VP YNPT[11r'T flub.) <br />(Might or dbord possible (straight or elbow) <br />Figure 3-2 <br />3.3.1 Plumbing and Chlorinator <br />1. Mark locations to be drilled and/or tapped in the Pool's water recirculation piping as indicated <br />in Figure 3-2. Drilling and tapping either the pipe or fittings is acceptable. <br />2. Turn pool pump off at the breaker if not already done and shut all valves on the inlet and outlet <br />of the pump and close the filter valves. Also turn the pool heater off at the breaker. <br />3. Install the 2" x 1" SLIP pipe saddle clamps for the chlorinator (included in install kit) unless <br />the space available for their installation or piping configuration is such that they cannot be <br />installed. If the later is the case, the pool's piping must be drilled and tapped instead of <br />installing the saddles. <br />4. Drill and tap two holes in the pool's piping for the wet cell. Drill two 7/16" holes (tap 1/4" <br />NPT) for the 1/2" tubing to and from the wet cell. <br />5. Drill another 7/16" hole and tap 1/4" NPT after the heater; this hole is for the acid injection. <br />POOL & SPA Installation and Operation Manual 3-3 <br />