Laserfiche WebLink
LOGE 20-43: Silva Percolation Test Page 3 <br /> September 21, 2020 <br /> Discussion of Septic System Sizing <br /> Septic system construction should follow the San Joaquin County On-Site Wastewater <br /> Treatment Systems Standards (2017) where applicable. The new septic system will require a <br /> permit from the San Joaquin County Environmental Health Department. <br /> We are pleased to be of service on this project. Please feel free to contact us should you have <br /> any questions. <br /> Sincerely, <br /> Live Oak GeoEnvironmentai, Inc. <br /> Abigail acco, Project Manager 4�Sr�1�JlVA <br /> o <br /> OAVIp J.WELCH <br /> �} NCS.2151 <br /> CERTIFIED <br /> David elch, Engineering Geologist ,� crcxoC4Sr <br /> CEG-2151, CHG-653, PGP-10149 FOFCALIF[J��P <br /> Attachments: Plate 1: Vicinity Map <br /> Plate 2: Site Map <br /> Percolation Test Permit <br /> Percolation Test Form <br />