Laserfiche WebLink
LEGEND GENERAL NOTES <br /> 1. INSTALL ALL WORK IN ACCORDANCE WITH ALL CODES AND AS PER MANUFACTURER'S WRITTEN INSTRUCTIONS.MAINTAIN MANUFACTURER'S SPECIFIED <br /> EXISTING WALL <br /> CLEARANCES FOR ALL EQUIPMENT. <br /> 10'l <br /> NEW 6"MTL STUDS 116"O.C.,(20 GA FOR WALS UP TO 14',18 GA <br /> FOR WALLS ABOVE 14'&AT DOOR OPENINGS),w11I2"M.R.GWB, 2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS SHOWN ON DRAWINGS AND TO REPORT ANY DISCREPANCIES TO ARCHITECT AND/OR <br /> VJ <br /> R-19 BATT INSUL,&(1)LAYER DOW DEFENDAIR INTERIOR,AND SAFEWAY REPRESENTATIVE. <br /> � ALIGN NEW WALL 112"PLYWD EXTERIOR,VERIFY INSULATION TYPE w/SAFEWAY -04 <br /> 0 <br /> -- ~� WITH EXISTING PROJECT MANAGER DEMOLMON NOTES 0 N O <br /> ~~ 3 - -------�� r d• cY <br /> EQUIPMENT NUMBER, -. <br /> _ <br /> A2 0 0 --- ® SEE EQUIPMENT SCHEDULE. 1. VERIFY EXTENT OF DEMOLITION wISAFEWAY REPRESENTATIVE BEFORE COMMENCING <br /> F--___ TYP @ALL �" � �-, <br /> - `_ -- l\ 1 PATCH,REPAIR AND CLEAN FLOORS AND WALLS TO MATCH EXISTING. <br /> - __ _ EXISTING WALLS - ��� 2. PAC <br /> a Y �—s � f �' `O �D <br /> III ALL NON-COOLER WALLS: REMOVE <br /> 3. VERIFY DISPOSITION OF REMOVED EQUIPMENTw1SAFEWAY REPRESENTATIVE. <br /> ---� EXISTING SHEATHING.PROVIDE R-19 W) � 1 <br /> RELOCATE STERILOX ' BATT INSULATION AND 112"M.R.GWB <br /> FRESH GDS SYSTEM <br /> - ----- BLOCKING NOTES <br /> SE BIB REMOVE EQUIPMENT FLOORS-EPDXY c\l <br /> RELOCATE HO STONHARD STONSHEILQ HR1#254MH. O <br /> / MEDIUM 1. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING APPROPRIATE BLOCKING IN NEW AND EXISTING PARTITIONS FOR ATTACHMENT OF ALL WALL a <br /> \ / COLOR:NUTMEG,TEXTURE. <br /> BASE-6"EPDXY BASE 2 MOUNTED ITEMS IN THE PROJECT. G.C.SHALL REVIEW WITH THE SAFEWAY REP,THE BLOCKING NOTES AND ALL WALL MOUNTED ITEMS SHOWN IN DRAWINGS <br /> \ f TO DETERMINE IF ANY ADDITIONAL BLOCKING IS REQUIRED. <br /> WALLS FRP A2 <br /> �? COMPARTMENT SINK, WORK TABLES w1SHELVES,AND AT ALL OTHER EQUIPMENT WHERE BLOCKING IS REQUIRED. <br /> MARHTE #P 140,COLOR:IVORY TYP @ ALL 2. PROVIDE 112"PLYWOOD BLOCKING 3 <br /> rr,mj{I wIMARLITE TRIM,COLOR:IVORY NEW WALLS <br /> x(`ii TRIM SINK TO REMAIN ' <br /> C <br /> RELOCATE HAND SINK <br /> EQUIPMENT SCHEDULE <br /> NOTE: THE EXISTING TRIM SINK TO \ ! NOTE: <br /> BE REMOVED AND TEMPORARILY ALL DIMENSIONS ARE TO FINISHED <br /> RELOCATED AND RECONNECTED NEW INSULATED HIGH MATERIALS UNLESS OTHERWISE NOTED. EQi� STATUS DESCRIPTION MANUFACTURER MODEL REMARKS v <br /> TO BE FULLY OPERATIONAL FOR \ IMPACT DOOR T-2'l - l <br /> F THE PRODUCE DOOR&FRAME NOTE: <br /> THE DURATION O TALL FRP TO COOLER WALLS(TYP). <br /> � ROOM REMODEL.VERIFY � SUPPLIED BY SAFEWAY 1. INS ,-� <br /> IF BLOCKING IS REQUIRED,APPLY <br /> PROVIDE SPLASH GUARDS AS REQUIRED � �� •U <br /> O TEMPORARY LOCATION OF TRIM 1 EXISTING TO TRIM SINK <br /> SINK WITH SAFEWAY REP. 112"PLYWOOD SHEATHING AND FRP. REMAIN PURICORE 2300lPF C <br /> \ UN <br /> STERILOX PRODUCE FRESH CDS SYSTEM STERILOX FRESH ST6-36365 SW-C <br /> DEMOLITION NOTE: 2. APPLY SEALER TO ALL NEW PLYWOOD.REMOVE EXISTING LIGHTS. 87"3 COMPARTMENT SINK SEE P1 SHEET SEE P1 SHEET PROVIDE SPLASH GUARDS A5 REQUIRED <br /> NSTALL @ 5`6"A.F.F.AND AS PER MANUFACTURER'S eJECOLAB SANITIZING FOAMING SYSTEM ECOLAB INSTRUCTIONS <br /> PROVIDE SPLASH GUARDS ON BOTH SIDES OF HAND <br /> O RELOC HAND SINK JOHN BOOS SINK IF NONE ARE EXISTING <br /> �+ WORK <br /> ILEA-DEMOL � ION PLAN <br /> � 2 PRODUCE WORK � '�E � =FL000R PLAG�9 <br /> DUCE VVOT�f� AI� © NEW HAND-WRAP STATION IiOBART X132 <br /> 1 PRO Al SCALE: 1I4"=1'0" <br /> O NEW FOOD PREPARATION MACHINE ROBOT COUPE CL50 <br /> Al SCALE: 114"= 1'-0" <br /> Z <br /> TO BE REMOVED. <br /> EQUIPMENT 8 NEW SCALE BIZERBA KH 100 0 [NV <br /> ____-.___ DASHED LINE INDICATES EQUIP O <br /> VERIFY w1SAFEWAY REP THE EQUIPMENT TO BE RELOCATED. <br /> O NEW 3' 0"x3'-0"5S WORK TABLE JOHN BOOS J00 <br /> Q 00 <br /> Lo C7 <br /> _ 10 <br /> NEW 2'-6"x4'-0"SS WORK TABLE JOHN BOOS � Z <br /> �l �.. Lu <br /> _ U J <br /> ---- _ _ - ------- o o w <br /> - �--��� -- --- ------- --- --- --------- 11 NEW 2'-6"x6'-0"SS WORKTABLE JOHN BOOS � � � Z U <br /> _ � C� W U <br /> ------ - 12 <br /> ---- ---~--------- - - ---------- 20 _ o INSTALL a�5'-6"A.F.F VERIFY LOC.WI SAFEWAY REP. Z I- <br /> ry _ -- -- - - \ - J 13 (4)NEW 14"x48"SS WALL SHELF JMG 32466 BLOCKING:112"PLYWOOD u Q z Lu <br /> 17 <br /> � - � Q � II <br /> 2 14 � TOP OF RACK @ 6'-0"A.F.F. <br /> 9 14 NEW '12"x48"SS POT RACK WI DRAINING SLOTS JMG 11854 BLOCKING:112"PLYWOOD <br /> 91 Z 00 Q U <br /> W C ~ Lu <br /> W <br /> 3 d 1 <br /> 0 1 6 13 NEW OR COMPOST RECYCLING BIN RUBBERMAID 1788472 VERIFY LOCATION WITH SAFEWAY REF. o r ) Ll <br /> J <br /> 15 RELOC w 1J J a <br /> z -` MOUNT AS PER MANUFACTURER'S SPECIFICATIONS. U W <br /> 16 "' w jf 9 16 NEW RLFRIGERATED EVAPORATOR COIL HUSSMANN GL26A135E8 <br /> VERIFY MODEL AND LOCATION W!HUSSMANN REP, <br /> ;� �' I 11 13 /GD SEE MOUNTING DETAIL 131A2, s <br /> �\ SHIPPING WEIGHT: 140,CFM: 1,200 Z <br /> s~ <br /> N <br /> 0 17 (2)NEW LIGHTING SEE E1 SHEET SEE E1 SHEET <br /> 5 $ SEE DTL 11A2.VERIFY LOCATION WITH SAFEWAY REP. <br /> cs' `° Lid - - HUSSMANN Q2-SS-4S VERIFY Wl SAFEWAY REP REMOVAL OR RELOCATIONN of <br /> U) r --- - - 18 (2)NEW 4'2 DECK MOBILEd <br /> 0 OF EXISTING DISPLAYS PRIOR TO INSTALLATION. [L' 0 <br /> N 17 REMOVE EXISTING ENDCAP.INSTALL NEW ENDCAP o 0 <br /> W1 McCUE 18"CORNER GUARDS(TYP.2).ANCHOR (� �l <br /> 19 NEW 4'MULTI DECK CASE HUSSMANN CF5X CL <br /> a-, U) <br /> \ \ / TO FLOOR,SEE DTL 91A2. <br /> VERIFY LOCATION W!SAFEWAY REP. Z <br /> NEW 516"MRGWB CLG @ 9'-0" NOTE: VERIFY LOCATIpN dF � ., <br /> NOTE: �� / ~ LLL! ti Z Q <br /> AFF. SEE CEILING JOIST EXTEND AND10R �y ADDITIONAL SHELVES wISAFEWAY REP 3 <br /> SCHEDULE THIS SHEET AND 20 RELOC HOSE BIB SEE P1 SHEET SEE P1 SHEET SEE P1 SHEET <br /> RELOCATE SPRINKLER U WLo <br /> DTLS ON SHEET A2. PAINT HEADS AS PER NEPA 13 $ J <br /> wIHIGH GLOSS WASHABLE FOR NEW CEILING AND LU � < ~ <br /> ENAMEL PAINT,COLOR:WHITE. NEW WALL LAYOUT - Z z <br /> PROVIDE R-30 INSUL ABV CLG �1 p i1 <br /> � � z0 0 W <br /> Q JUI U w <br /> P LLLLJ 0 <br /> PRODUCE WORK AREA-REFLECTED CEILING PLAN <br /> 4 PRODUCE WORK AREA-I LOMPMENT PLAN <br /> 3 Al SCALE. 114"= 1'0" 2 <br /> Al SCALE: 114"= 1'-1 <br /> U) CD <br /> REMODELED <br /> H PRODUCE �� ❑ w <br /> Q <br /> w LLQ w <br /> WORK AREA ' � �� C I H� 0 <br /> H-1 a <br /> J <br /> JOIST SCHEDULE <br /> CEILING <br /> O <br /> lr II <br /> CLIP CONN.AT WALL(EA STUD) <br /> ® , <br /> JOIST CLIP CONN TO MTL WOOD STUDS @ MASONRY <br /> MIN.JOIST CLIP @ STUDS @ -.] <br /> SPAN JOISTS <br /> 0 <br /> 800S162-33 @ <br /> 4-#10 x 11/4"WOOD 3-3/16"l °� -. <br /> L50 3-#10 SMS 3-#10 SMS CONCRETE ° ° Q N <br /> 11'-0"MAX SCREWS O a o <br /> 24"O.C. SCREWS o <br /> 3-3116"x1 <br /> 800S162-43 @ 4 #10 x 1 1!4"WOOD CONCRETE ® a o o E <br /> Q 15'-0"MAX L50 3 #10 SMS 3 #10 SMS SCREWS Z <br /> 24"O.C. SCREWS t F= <br /> l 0 <br /> 54 @ � - Q � <br /> 0 1 DDOS162 5 4-3116"x1 W <br /> #10 x 1 114"WOOD o c <br /> 20'-0"MAX L70 4-#10 SMS 4-#10 SMS SCREWS CONCRETE ' o cwi) w <br /> Q 0 24 O.C. (50 KSI) SCREWS LU w <br /> 5 <br /> 3116"x1 <br /> ° w 0 <br /> ( w <br /> 12005162-68 @ 6-#10x 1 1!4' WOOD CONCRETE A <br /> 24"O.C.(50 K51) L90 5 #10 SMS 5-#10 SMS <br /> 23'-6 MAX SCREWS <br /> NEW PRODUCE SCREWS ❑ <br /> � � w <br /> 13 <br /> E <br /> CRATES o <br /> s <br /> NOTES: <br /> 1,CLG JOISTS TO ALIGN wMlALL STUDS. <br /> 2.THE SPACE ABOVE THE CEILING IS NOT TO BE USED FOR STORAGE. - <br /> Q 6'3" 18 3.WHERE CLG JOISTS ARE SHEATHED ON TOP,PROVIDE FULL DEPTH BLOCKING @ 8'-0"O.C.MAX. WHERE y �, <br /> 0 DEPTH BLOCKING 4'-0"O.C.MAX.SEE DTL 61A2 � a �' <br /> CLG JOISTS ARE NOT SHEATHED ON TOP,PROVIDE FULL D @ <br /> 9'D" - <br /> 4.AT SIDE WALL END BAYS PROVIDE TRANSVERSE JOISTS @ 24"O.C.ALIGN wl STUDS BELOW. CONNECT O <br /> NEW PRODUCE w1L50 FASTENERS USING(2)#10 SMS MIN. ZI CD <br /> CRAT 5 CD <br /> 18 HEADER SCHEDULE <br /> CD w o <br /> Lu <br /> NEW RETAIL 8 � < oo <br /> U m <br /> OPENING MATERIAL <br /> FASTENING NOTES CASES.SCE 51A1 <br /> +4! <br /> 72 MAX 600E150-33 ( ) <br /> 3 #10 SMS TO ALL STUDS PLUS(1)#10 SMS AT TOP TO TRACK AT EA STUD m <br /> OPN'G DOUBLE-L LOCATION.EXTEND OVER ALL JAMB STUDS Hamm = e� �- <br /> JAMB STUDS p I I MANTECA, CA <br /> ❑ p o =0 <br /> OPENING MATERIAL FASTENING NOTES <br /> II <br /> ❑ c� 0 72"MAX PROVIDE(1)ADDITIONAL STUD EA SIDE PLUS 20 GA #10 SMS @ 12"O.C. 1 Zo <br /> I 1 <br /> OPN'G TRACK TO FORM BOX SECTION KEY PLAN <br /> AI11 11ii 11 I A 1111 P I .. I i 11 1` {\ I I <br /> 5 RETAIL <br /> �RE�A - EQUIPIiENT PLANS <br />