Laserfiche WebLink
CANTILEVER 7 8 REVISIONS <br /> RE:PLAN IA <br /> PL. 1/2"x8"x8", S3.2 3/4"0 x 2"EXT.THREADED ALL STEEL TO BE PRIMER PL. 1/2"x8"x8", <br /> RE: S3.2--3 NELSON STUD,TYP.AT PAINTED PER SPECS,AND RE: S3.2--3 6 <br /> FRAME LEGS,FIELD LOCATE TOUCHED IN FIELD AFTER ALL <br /> CONSTRUCTION IS IN PLACE 53.2 T-2 1/4" 91- 11 1/811 T-2 1/4" 1 8'-0 3/8" <br /> oe <br /> 1/4 v V.I.F.W/FLUID COOLER V.I.F.W/FLUID COOLER V.I.F.W/FLUID COOLER <br /> I <br /> W-BEAM, 2 2 <br /> RE:PLAN S3.2 S3.2 <br /> 1 (E)OWSJ GIRDER, O° ii P P <br /> RE:PLS PL. 1/2"x12"x15", <br /> ° RE:S3.2-3 <br /> 171 w NOTE:PRIOR TO FABRICATION-CONTRACTOR <br /> STIFFENER PL.3/8 x E ROOF DECK <br /> W-BEAM,RE:PLAN ~"• O � TO VERIFY ALL FRAME/SUPPORT DIMENSIONS 4 � <br /> FULL DEPTH EA. SIDE I I RE:PLAN 4 <br /> WITH EXISTING CONDITIONS AND ACTUAL S3.2 <br /> „ I I I 1/4 � 211 1 (E)ROOF DECK, MECHANICAL UNIT SUPPORT REQUIREMENTS <br /> S3.2 <br /> PL. 1/2 x12 x15 , <br /> RE: S3.2--3 - (E)OWSJ JOIST, I I RE:PLAN PRIOR TO INSTALLATION <br /> /// RE:PLAN <br /> PIPE 6 SCHD.40 SOLID GROUT 32"LONG I I DEMO(E)CMU CAP PLATE 1 <br /> CENTERED ON POST DOWN FOR(N)PLATE INSTALL <br /> TO NEXT BOND BM.,32" <br /> MIN. <br /> I <br /> 00 <br /> PL. 1/2"x8N12"W/(2)3/4"0 ARCH. PROJECT NO. <br /> HILTI HY270 EPDXY BOLTS 2004 <br /> W/6-3/4"EMBED IN o <br /> GROUTED CELLS <br /> ` DRAWN <br /> PL. 1/2"x8N12"W/(2)3/4"0 <br /> - HILTI HY270 EPDXY BOLTS " TJN/FJR <br /> (E)CMU WALL, <br /> RE.PLAN W/6-3/4"EMBED IN <br /> JL GROUTED CELLS (E)OWSJ GIRDER AS CHECKED <br /> OCCURS,SOLID GROUT DNS <br /> SOLID GROUT 32"LONG (E)CMU WALL, (E)JOIST GIRDER SUBMITTAL DATES <br /> CENTERED ON POST DOWN RE:PLAN ELEVATION'lA' POCKET IN CMU 3 <br /> S3.2 <br /> I <br /> TO NEXT BOND BM.,32" S 2 06/11/20 <br /> MIN. <br /> W 14x74 L4X4X1/4 W 14x74 <br /> OTB DATE <br /> Ti <br /> 1 7 <br /> W-BEAM FRAME TO POST/CMU <br /> M� V <br /> 1 <br /> ° <br /> 1 1-0 11 — 1 11 �y .--I ° Q°° F- W 00 m <br /> .1 .d <br /> w y W r3 O c� <br /> lift <br /> l" V W'o U Q z w U a <br /> — �� H /� �Qw C7 �zNo <br /> G7 Vi W V] N <br /> 1� t O g W ° Z' o �j rx h V b <br /> 11/2" 811 11/2" � � aa �� a� �'© � z �oQ�e <br /> �Q0�7gnG <br /> N au Zara k �aUNy <br /> (N)W-BEAM, Q �QuAa � �° z E3OM <br /> 0 0 " 1 � 0 W O Q A C a�e <br /> PL. 1/2 x REQ D. RE:PLAN <br /> ALL STEEL TO BE PRIMER o z° ° W <br /> KNIFE PLATE F, w ° w U° a� <br /> PAINTED PER SPECS,AND PL. 1/2"xVxV PL. 1/2"xVxV, w w ° W° Q H <br /> a � <br /> RE.S3.2-6 I NEW FLUID gOOLERS, _ cn <br /> TOUCHED IN FIELD AFTER ALL PIPE 6"SCHD.40 1 3 TOP&BOT. F °o z <br /> CONSTRUCTION IS IN PLACE <br /> 3/4 0 HILTI HY270 I W=20,765LB EACH N w x o o W a W <br /> EPDXY BOLTS w <br /> W/6-3/4"EMBED IN <br /> INSTALL PLATES OVER PIECE OF °O GROUTED CELLS <br /> N <br /> TPO TO PROTECT WALL,RE:A7 (1)BOLT PER CELL, c <br /> 0 o MAX.#PER SCHED. M <br /> N ANGLE BRACE,RE: PLAN W <br /> Q, ALIGN W-BEAM <br /> W 14 BOT.FLANGE W/ <br /> BOT.OF PLATE 3/8"STIFF.PL.EA.SIDE OF II II 'k Q r' <br /> W-BEAM WEB II RE:PLAN 1 O Q M <br /> o0 <br /> (E)CMU WALL L. 1/2"x12N15" 1/4 O Q o <br /> RE:PLS AT TOP OF POST <br /> - c O <br /> � U <br /> 3/4"0 HILTI HY270 <br /> EPDXY BOLTS <br /> W/6-3/4 EMBED IN <br /> LL <br /> Q <br /> GROUTED CELLS ---- it � � 65 � 6S b� �S � W <br /> SOLID GROUT CMU AT <br /> W-BEAM ATTACHMENT 8" M - - M-11 <br /> N <br /> BEYOND ALL EPDXY 1/4 W14x74i L4X4X1/4 W14x74 C � � W <br /> Lu <br /> ANCHORS AND DOWN TO(E) ALL STEEL TO BE PRIMER L L = * O O <br /> ROOF BOND BEAM BELOW PAINTED PER SPECS,AND <br /> JL <br /> TOUCHED IN FIELD AFTER ALL "' a <br /> V (N)W-BEAM, CONSTRUCTION IS IN PLACE <br /> RE:PLAN <br /> 1 1 <br /> KNIFE PLATE, S3.2 TYP. TYP. <br /> S3.2 <br /> RE:53.2-6 z <br /> W-BEAM TO CMU WALL FRAME CONNECTION PLAN VIEW <br /> 2 �� , <br /> 1if = 1-0 3 1if - 1-0 7, <br /> C-rrlvr <br /> (E)CMU WALL, <br /> ,� 8 q 1V1t <br /> RE:PLAN CA <br /> v2020 <br /> F <br /> REAR <br /> BEAM #&SIZE OF BOLTS LATE SIZE WELD SIZE FLUID COOLER PLATFORM FRAMING PLAN LEFT NORTx RIGHT <br /> p W8 (2)3/4"DIA. 3/8X4X0'-6" 1/4 A ,/4' _ <br /> ,1-011 <br /> W 10 (2)3/4"DIA. 3/8X4X0'-6" 1/4 <br /> - FRONT <br /> N I W12 <br /> (3)3/4"DIA. 3/8X4X0'-9" 1/4 <br /> 5 I \ L TO W-BEAM WEB, &UNDERSIDE W14 (3)3/4"DIA. 3/8X4X0'-9" 1/4 <br /> 53.2 1/4 OF TOP FLANGE, TYP. W16 (4)3/4"DIA. 3/8X4X1'-0" 1/4 <br /> W-BEAM,RE: PLAN W18 (5)3/4"DIA. 3/8X4X1'-3" 1/4 <br /> ANGLE BRACE, RE:PLAN W21 (6)3/4"DIA. 3/8X4X1'-6" 5/16 8 <br /> W24 (7)3/4"DIA. 1/2X4X1'-9" 3/8 <br /> W27 (7)3/4"DIA. 1/2X4X1'-9" 3/8 <br /> CL O <br /> GIRDER r� <br /> NOTE:PRIOR TO FABRICATION-CONTRACTOR • <br /> L TO W-BEAM, Lox, RE:PLAN TO VERIFY ALL FRAME/SUPPORT DIMENSIONS O <br /> TYP. 1/4 1/2" WITH EXISTING CONDITIONS AND ACTUAL <br /> ALL STEEL TO BE PRIMER W-GIRDER MECHANICAL UNIT SUPPORT REQUIREMENTS <br /> PAINTED PER SPECS,AND W-BEAM PRIOR TO INSTALLATION M <br /> TOUCHED IN FIELD AFTER ALL �+y <br /> CONSTRUCTION IS IN PLACE <br /> -<(3) <br /> 3 SIDES 41- 1011 <br /> KNIFE PL.TO o 1/4 <br /> BEAM WEB --- <br /> �,,, � o PS-1 O <br /> 3,000# <br /> zi <br /> —< <br /> SG� V 1 <br /> II % LTO W-BEAM WEB, &UNDERSIDE ° <br /> 1/4 OF TOP FLANGE, TYP. - BOLTS,A-325 HSS6x4xl/4 O <br /> N <br /> 53.2 II ANGLE BRACE,RE: LAN ANGLE BRACING <br /> 0 0 <br /> H <br /> 53/8"FULL DEPTH STIFFENER PL., <br /> 1" = 1'-011 SHEAR PL MATCH BM ga. r� <br /> 1 1/2" 2 1/2" v 1 <br /> REINFORCE JOISTS BELOW <br /> N SKID FRAME,RE: S3.1-7 <br /> �o <br /> BRACE ANGLE TON W-BEAM W-BEAM TO W-BEAM <br /> 4 <br /> 1 7 11 = 11-011 6 1 11 = 1 1-011 <br /> l 1 �7 <br /> 4 4 _ <br /> HSS6x4x 1/4 <br /> = o <br /> K K <br /> CANTILEVER AS OCCURS = "' <br /> RE:PLAN HSS6x4x1 4 FLAT,TYP. <br /> �c �c <br /> 3/4"0 x 2"EXT.THREADED `O `O <br /> COOCOO <br /> NELSON STUD,TYP.AT <br /> 1/4 4 1 FRAME LEGS,FIELD LOCATE HSS6x4xl/4 FLAT,TYP. _ <br /> N <br /> 1 NOTE: CAP ALL OPEN ENDS OF BENT PL.3/8"x REQ'D.AT O1 <br /> HSS MEMBERS,TYP. <br /> EACH POST v <br /> PL.TO DECK AT <br /> BENT PL. <br /> P4 � 1 1/4 HIGH FLUTES 2 <br /> 3/8"x REQ'D. U CAP PL. 1/4"x6"x6" ROOF INSULATION,RE:ARCH. 11.011 PL.TO <br /> P4"SCH.40 3/16 OWSJ <br /> ROOF DECK, F OWSJ JOIST BELOW HSS6x4xl/4 <br /> RE:PLAN cv 1 <br /> 1/4 _ _ <br /> w I I <br /> OWSJ JOIST, PL.TO - -_ <br /> RE:PLAN <OWSJ - - N <br /> P4"SCH.40,CENTER <br /> i ON JOIST <br /> I <br /> ROOF DECK,RE:PLAN <br /> BLOCK BELOW DECK W/ 7 TYP <br /> HSS5x5xl/4x16"AT LOCATION S3.2 <br /> OVER W-BEAM <br /> SHEET TITLE <br /> BRACING AT EDGE OF PLATE <br /> AS REQ'D.,RE: <br /> ROOF FRAMING <br /> DETAILS <br /> 8 REAR <br /> aLEFT NORTH RIGHT SHEET <br /> N PUMP SKID PLATFORM FRAMING B PUMP SKID PLATFORM FRAMING PLAN <br /> -0 1/211 - 11-011 <br /> FRONT <br /> S3 ,92 <br /> N <br /> O <br /> N <br /> O <br /> N <br />