Laserfiche WebLink
a"'"` Gti SAN JOAQUIN <br /> ° c� Environmental Health Department <br /> y YKase Foley , REHS Interim Director <br /> Q = � <br /> l COUNTY <br /> PROGRAM COORDINATORS <br /> °gtiFoa?�P Greatness grows {fere . Robert McClellon , REHS <br /> Jeff Carruesco , REHS, RDI <br /> Michael Kith , REHS <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> Melissa Nissim , REHS <br /> November 7 , 2019 <br /> DOUG YOUNG <br /> CONFIDENCE UST SERVICES <br /> 16250 MEACHAM RD <br /> BAKERSFIELD , CA 93314 <br /> Re : GAS DEPOT #2 <br /> 1330 E YOSEMITE AVE SR0080109 <br /> MANTECA , CA 95336 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of <br /> the application for a permit to replace the 91 and diesel drop tubes on the underground storage <br /> tank ( UST) system at the above noted address . The permit has been approved with the <br /> following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work . All new addenda supersede the previous ones . <br /> 3 . Contact Paul Nso at (209 ) 468 - 3432 to arrange the following appointments (a 48 - hour <br /> notice is required for inspection appointments ) . <br /> • Overfill prevention verification : Measurement of drop tubes to verify 95 % tank volume <br /> shut off. Verification of flapper functionality . Ensure that all pertinent tank charts and <br /> calculations are available for review at the time of inspection . <br /> • Verification that ball floats ( s ) , if installed , do not interfere with the installed flappers <br /> Valve . <br /> • If concrete will be broken near the 91 and diesel tanks , a secondary containment <br /> test must be performed on these tanks once concrete is poured in accordance with the <br /> manufacturer' s guidelines and test results submitted to the EHD within 30 days of <br /> testing . <br /> Please be aware that the facility cannot receive fuel in the 91 and diesel Tanks <br /> prior to the EHD inspection and approval. <br /> 4 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br /> a . Possess or be employed by a person who possesses one of several permissible <br /> valid , current contractor' s licenses issued by the Contractors State License Board <br />