My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1330
>
2300 - Underground Storage Tank Program
>
PR0515864
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 6:53:08 PM
Creation date
9/24/2020 9:39:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0515864
PE
2361
FACILITY_ID
FA0012355
FACILITY_NAME
A&A GAS FOOD MART
STREET_NUMBER
1330
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120053
CURRENT_STATUS
01
SITE_LOCATION
1330 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page of <br /> 8. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By : 0 UDC Manufacturer ❑ Industry Standard X Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : [I Pressure ❑ Vacuum X Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : Caldwell Level Change Indicator Equipment Resolution : . 002 <br /> UDC # 9 & 10 UDC # 11 & 12 UDC # UDC # <br /> � UDC Manufacturer: Western Western <br /> UDC Material : Fiberglass Fiberglass <br /> UDC Depth : 30" 30" <br /> Height from UDC Bottom to Top 10" 10" <br /> of Highest Piping Penetration : <br /> Height from UDC Bottom to 8 " 8 " <br /> Lowest Electrical Penetration : <br /> Condition of UDC prior to Dry Dry <br /> testing: <br /> Portion of UDC Tested ] Water Line 14" Water Line 14" <br /> Does turbine shut down when <br /> UDC sensor detects liquid (both Yes Yes <br /> product and water)? * _ <br /> Turbine shutdown response time Not Alarmed Not Alarmed <br /> Is system programmed for fail- Yes Yes <br /> safe shutdown? ' <br /> Was fail-safe verified to be No No <br /> operational ?* <br /> Wait time between applying 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time : 9 : 02 9 : 07 <br /> Initial Reading (Ri) : . 001 . 001 <br /> Test End Time : 9 : 32 9 : 37 <br /> Final Reading (RF) : . 001 . 001 <br /> Test Duration : 30 Minutes 30 Minutes <br /> Change in Reading (RF-RI) : 0 0 <br /> Pass/Fail Threshold or Criteria: . 005/30 Minutes . 005/30 Minutes <br /> Test Result : Pass Pass <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced and Yes Yes <br /> verified functional after testing? <br /> Comments — (include information on repairs made prior to testing, and recommended folloly-up for failed tests) <br /> ] If the entire depth of the UDC is not tested, specify how much was tested . If the answer to an of the questions indicated with an <br /> asterisk ( * ) is "NO" or "NA", the entire UDC must be tested . (See SWRCB LG460 ) <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.