My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
845
>
2200 - Hazardous Waste Program
>
PR0507085
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 5:44:02 PM
Creation date
9/24/2020 2:50:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0507085
PE
2227
FACILITY_ID
FA0004925
FACILITY_NAME
Caltrans-Lodi
STREET_NUMBER
845
Direction
E
STREET_NAME
PINE
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
845 E Pine St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA- DEPARTMENT OF TRANSPORTATION <br /> BMP TAILGATE MEETING REPORT <br /> NPDES-001 (REV 10/2017) <br /> ACTION AND DISTRIBUTION: <br /> 1. First line supervisor conducts meeting, completes, and signs form <br /> 2, First line supervisor retains and posts a copy <br /> 3. First line supervisor forwards a copy to second line supervisor for review and signature <br /> 4. Second line supervisor signs and returns the copy to first line supervisor to file in FPPP binder and forwards the copy to the <br /> Maintenance Storm Water Coordinator <br /> REGION OFFICENARD <br /> Lodi <br /> DATE OF MEETING COST CENTER ,r <br /> 09/10/2018 10-2608�- \0— 'Jfl c,�A <br /> ATTENDANCE: <br /> Employee Name (Print) Employee'JEmployee Signature Employee Name(Print) Signature <br /> BMPs Discussed (List): <br /> Welding and Grinding <br /> �]Other <br /> Suggestions for SMP Improvements <br /> APPLICATION The following procedures are used where welding and grinding work may pollute storm water runoff or discharge to storm <br /> water drainage system and watercourses. <br /> LIMITATIONS,The BMPs for this activity provide operating methods or measures only for the purpose of storms water pollution prevention. <br /> The applicable local,state and federal hazardous materials,employee safety and fire prevention requirements are not presented. <br /> Supervisor's Comments <br /> OPERATIONAL PROCEDURES , <br /> • Secure all equipment and tools. Prevent foreign objects from being dropped into the watercourse. <br /> •Use appropriate containment when welding over the side of a bridge to capture slag and metal grindings. <br /> • ,For welding work over a storm drain inlet,protect the drain inlet to prevent grindings and debris from entering the storm water drainage <br /> system or watercourses <br /> • .For welding work on the deck services or expansion plates,use maintenance traveler or wing staging to capture grindirigs and debris <br /> •.(Remove all slag and debris from the deck or other work sites when the job is completed, ) <br /> FIRST LINE SUPERVISOR (Print) SECO p LINE SUPERVISOR(Print) <br /> FIRST LINE SW, ERVISO (Signature) DATE SECOND LINE SUPERVISOR (Signature). DATE <br /> f �m 091101201.8 _ 09/10/201$ <br /> Forwa d completed copy to the District Maintenance Storm Water coordinator Post completed copy in crew room or 3)ye book, <br /> keep copies for minimum of three(3}years. <br /> thi- rinriimant ifi avaiiahia. in alternata formats. For alternate format information, contact the Forms <br />
The URL can be used to link to this page
Your browser does not support the video tag.