My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4600
>
3600 - Recreational Health Program
>
PR0360045
>
WORK PLANS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 4:52:57 PM
Creation date
9/24/2020 3:19:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3600 - Recreational Health Program
File Section
WORK PLANS
RECORD_ID
PR0360045
PE
3616
FACILITY_ID
FA0002104
FACILITY_NAME
SUSD-FRANKLIN HIGH SCHOOL
STREET_NUMBER
4600
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14331006
CURRENT_STATUS
01
SITE_LOCATION
4600 FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 3 15 GENERAL NOTES: <br /> I. ALL LOW VOLTAGE GABLES SHALL BE ROUTED IN CONDUIT IN NON ACZE551BLE CONGEALED <br /> CEILING SPACES. PROVIDE J-HOOK5 AT 4'0"OC. AS REQUIRED FOR ROOM AREAS WITH 5. ALL FIBER OPTIC STRANDS ARE TO BE TESTED BI-DIRECTIONALLY AT BOTH 850nm AND 1300nm WAVELENGTH. TESTS ARE <br /> 4 5 AOEB5IBLE T-BAR CEILING SPACES.SEE DETAIL FOR J-HOOK MOUNTING REQUIREMENTS. TO BE PERFORMED U51NG A OPTICAL POWER METER AND LIGHT SOURCE OR AN OTDR TO MEASURE ATTENUATION FROM <br /> COUPLET-TO-COUPLER AT THE P15TR15UTION PANELS. NO STRAND 15 TO EXHIBIT MORE THAN 3.75 d5/km AT 850nm AND 1.5 <br /> 2 (E)SYSTEM 15 VOIP. CONTRACTOR SHALL HAVE MINIMUM 5 YEARS EXPERIENCE IN IN5TALLIN6 AND dB/km AT 1300nm. <br /> r ------ T---------------� TE5TIN6 VOIP SYSTEMS. CONTRACTOR SHALL BE RESPONSIBLE FOR A FULLY COMPLETEI o ----------- e I n-----------� I 6. ALL FIBER OPTIC,GABLE RUNS WILL BE,TE5TED AND DOCUMENTATION PROVIDED TO SHOW THAT EACH STRAND MEETS OR <br /> OPERATIONAL SYSTEM. <br /> EXCEEDS THE EIAITIA-455 STANDARDS. PROVIDE RECORDED TEST RESULTS ON ALL GABLES PASSED FOR OWNERS <br /> RECORDS. <br /> I <br /> I I DATA SYSTEM NOTES: T CONTRACTOR WILL TEST THE FIBER OPTIC GABLE PRIOR TO INSTALLATION TO CHECK FOR DEFECTS. IF THE CONTRACTOR <br /> I I I I DOES NOT TEST THE FIBER,AND DEFECTS ARE FOUND THAT REQUIRE THE GABLE TO BE REPLACED,THE CONTRACTOR IS <br /> I I I RESPONSIBLE FOR THE GABLE. <br /> (E) DATA/TEL bn+---------------L ���� I I OI DATA JACK/PORT REQUIREMENT5 TO INTERMEDIATE D15TRI5UTION FRAME(IDF)OR MAIN D15TRIBUTION FRAME(MDF) <br /> TO REMAIN --------------- ���� j j I A. INSTALL CATEGORY 6 GABLE IN CONDUIT AND/OR J-HOOKS FROM EACH PORT,DATA LOCATION WHERE SHOWN ON PLANS TO 8. CONTRACTOR WILL TEST THE INSTALLED FIBER OPTIC GABLES AND DOCUMENT EACH 5TRAND'S RESULT. IF ANY STRANDS <br /> I I I I THE NEAREST DESIGNATED IDF/MDF LOCATION,U.O.N.MAKE TERMINATIONS AT BOTH DATA OUTLET AND IDF/MDF LOCATION. ARE FOUND TO BE OUT SPECIFICATION,THE CONTRACTOR WILL REPAIR THE STRANDS TERMINATION AS NEEDED OR <br /> I I I I REPLACE GABLE IF REQUIRED. THE CONTRACTOR WILL RETEST AFTER REPAIRS. <br /> 1. ROUTE GABLE DIRECTLY FROM STATION TO IDF/MDF LOCATION WITHOUT SPLICE OR INTERRUPTION. <br /> O3 INSTALL(2)25 PAIR GAT 5 GEL FILLED GABLES FOR TELEPHONE. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. <br /> I I I 2. ALL DATA STATION GABLES TERMINATED IN THE OF/MDF WILL BE PLACED INTO MODULAR 45 PORT GAT.6 PATCH <br /> I I I PANELS. 1. ALL MULTI-PAIR COPPER GABLE RUNS WILL BE,TESTED AND DOCUMENTED. <br /> 3. PROVIDE GAT 6 5685 RJ45 MODULAR JACK(QUANTITY AS REQUIRED) 2. CONTRACTOR MUST SHOW RESULTS FOR THE FOLLOWING TESTS: <br /> a. MAKE TERMINATIONS AT IDF/MDF LOCATION ON(N)PANDUIT 5685 PATCH PORT PANEL.PROVIDE ALL ADDITIONAL a.CONTINUITY FOR ALL WIRE5 IN THE GABLE. 10 <br /> I I I HARDWARE A5 REQUIRED. b.CORRECT PAIR ORDER FOR ALL PAIRS TERMINATED OR REPLACED. n <br /> I j j I b. LEAVE 36 INCHES OF EXGE55 GABLE AT THE IDF LOCATION,BEFORE MAKING TERMINATIONS,FOR USE AS A SERVICE <br /> LOOP.SECURE EXCESS GABLE IN A NEAT WORKMANLIKE MANNER. 3. ANY GABLES NOT PASSING MUST BE REPAIRED OR REPLACED. VERDE DESIGN <br /> I I I I <br /> I I I I 4. THE CATEGORY 5 VOICE FEEDER GABLES BETWEEN THE(E)SBC,TELEPHONE RACK AND MDF RACK SHALL BE UNSHIELDED <br /> (E) TELEPHONE - I I I I I 4.ALL GAT 6 GABLES ARE TO BE TESTED FOR COMPLIANCE WITH GAT 6,U51N6 A HAND HELD NETWORK SCANNER. HARD TWISTED PAIR,25 PAIR,24 AWG SOLID CONDUCTORS GABLES FROM E55EX OR EQUIVALENT A5 APPROVED BY OWNER. LANDSCAPE ARCHITECTURE <br /> GABLE I I I I I I COPY AND SOFT COPY RESULTS ARE TO BE PROVIDED FOR ALL JAGK5 TESTED. NETWORK ANALYZER 15 TO BE A FLUKE OIL ABOUT 10'OF GABLE IN EACH END. CIVIL ENGINEERING <br /> I I j j I j I DSP 4500 OR OWNER APPROVED EQUIVALENT. SOFT COPY RESULTS TO BE PROVIDE ON A WINDOW 018 OR LATER SPORT PLANNING& DESIGN <br /> I I I I I I COMPATIBLE DISK. O ADJUST(E)FIBER PATCH PANELS AS NEEDED TO FIT NEW. FIELD LOCATE AND PROVIDE MODIFICATIONS AS NEEDED TO EXTEND <br /> - - - - - <br /> /� �I� - - - - - 1_7 5. ANY EMPTY RJ45 JACK OPENING ON THE FACE PLATE WILL BE COVERED WITH BLANK INSERT,LEVINGTON DEVICE. VOIP SYSTEM. 1843 Iron Point Rd #140 <br /> I," O5 PROVIDE<W FIBER OPTIC,PATCH PANEL TO TERMINATE NEW FIBER OPTIC GABLE. Folsom,CA 95630 <br /> a_1___________1-0_1___________1-ol 6. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENT5. <br /> tel: 916.415.6554 <br /> o_____________________________a 6 PROVIDE 6ROUNDIN6 CONNECTION TO BUILDING STEEL AND/OR NEAREST OLD WATER PIPE.MINIMUM 6ROUNDIN6 CONDUCTOR fax:408.985.7260 <br /> (E) TELEPHONE � / - O INTERMEDIATE P15TRIBUTION FRAME(IDF)TO MAIN DI5TRIBUTION FRAME(MDF). O SHALL BE#4 GU 6ND. <br /> www.VerdeDesignlnc.com <br /> BOARD I L--------------_ ____ J A. INSTALL FIBER OPTIC,GABLE IN CONDUIT FROM IDF LOCATIONS TO MDF LOCATION.MAKE TERMINATIONS AT BOTH ENDS OF O TYPICAL IDF RACK. IDF RACK IN BLDG SHALL BE WALL MOUNTED CABINET RACK HUBBEL#RE4XB. <br /> I <br /> r--1 I II GABLE WITH SC'TYPE CONNECTORS. <br /> I I I Og PROVIDE<NW GAT 6 MODULAR PATCH PANEL.QUANTITY AS REQUIRED TO TERMINATE ALL DATA OUTLETS+10%SPARE.PATCH <br /> I I J <br /> F 1. ROUTE GABLE DIRECTLY FROM OF TO MDF LOCATION WITHOUT SPLICE OR INTERRUPTION. PANELS SHALL BE A 46 PORTS PANEL. <br /> I <br /> o I I 2. CONDUIT SHALL HAVE NO MORE THAN(2)90 DEGREE BENDS.PROVIDE PULL BOXES WHERE NECESSARY TO LIMIT THE <br /> I I NUMBER OF CONDUIT BEN05 AND A5515T IN PULLING GABLE. O PROVIDE(1)HORIZONTAL WIRE MANAGER MODULE. STAMP <br /> L-J <br /> �_ 3. FIBER OPTIC GABLE SHALL BE(12)STRAND MULTI-MODE FIBER,OUTSIDE PLANT DISTRIBUTION,L005E TUBE,GEL FILLED. <br /> MANUFACTURER: BERK-TEK OP0012-653510/25 616ALITE FIBER OPTIC OR SEIGORE/GORNIN6 012KW4-1415OA20 ALT05# 10 SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENT5 FOR N)GAT 6 WALL RACK PATCH PORTS. O \,N,NDSCA qe <br /> (E) "MDF" FLOOR MTD ALL-DIELECTRIC OR EQUAL. �� 14,^0 EXI5TIN57 FLOOR MOUNTED RACK WITH(E)LADDER RACK. <br /> 11 <br /> 0 4. MAKE TERMINATIONS AT THE IDF LOCATION ON LEVITON RACK MOUNT FIBER OPTIC PATCH PANEL. MAKE TERMINATIONS <br /> a AT THE MDF ON(N)LEVITON RACK MOUNTED FIBER OPTIC PATCH PANEL. N0. 4089 <br /> 12 PROVIDE(N)VOIP SWITCHES AND HANDSETS. CONTRACTOR IS RESPONSIBLE FOR A COMPLETE OPERATIONAL <br /> >_ o.LEAVE 15'OF THE EXCESS FIBER OPTIC GABLE AT THE OF AND 15' O OF EXCESS FIBER OPTIC GABLE AT THE MDF C fn <br /> z SYSTEM. COORDINATE WITH 015TRICT IT REPRESENTATIVE ALL REQUIREMENT5 NEEDED TO PROVIDE A COMPLETE <br /> ¢ LOCATIONS BEFORE MAKING TERMINATIONS,FOR USE AS A SERVICE LOOP.SECURE EXCESS GABLE IN A NEAT OPERATIONAL YOIP SYSTEM. � C-)o WORKMANLIKE MANNER.ALL TERMINATED FIBER OPTIC GABLES IN IDF SHALL NOT EXCEED 12 STRANDS OR 6 PAIRS. <br /> 13 5/e"PLYWOOD TO MOUNT NEW IDF ENCLOSURE. INSTALL PER MANUFACTURES RECOMMENDATIONS. y Signature <br /> o b.F.O.TERMINATION OF MDF SHALL BE TERMINATED TOA 6U RACK MOUNT FIBER ENCLOSURE-LEVITON PART 7[ <br /> vWi #5R960-OON WITH SC GONNECTIONSANSERTS. EXPIRATION DATE. <br /> 5 2 14 PROVIDE 01500 SWITCH 3"150 SERIES. JULY 2021 <br /> 0 <br /> 5 PROVIDE A 12PR TELEPHONE GABLE FOR FUTURE SECURITY USE.TELEPHONE GABLE SHALL BE OUTDOOR RATED,USE qTF OF CAS\F�� <br /> 0 FOR NET LOCATIONS,GAT 3.ROUTE THE NEW 12PR GABLE IN THE NEW 4"0 ALONG WITH FIBER.PROVIDE TELEPHONE <br /> GABLE FOR EACH OF CABINET TO THE(E)MDF ROOM.ON EACH END OF THE TELEPHONE GABLE,COIL ABOUT OFT. <br /> a IN LENGTH IN EACH IDF.AT THE(E)MDF,COIL IOFT. IN LENGTH AT THE TELEPHONE 66 BLOCK TERMINALS. CONSULTANT <br /> Z <br /> N WALL MOUNTEDC) <br /> w OF ENCLOSURE <br /> 0 QROFESS/Oq <br /> 0 (5EE FLOOR 12 ��S•FER <br /> i PLAN5 FOR <br /> Z DATA OUTLET <br /> d 1 (TYP) QUANTITY AND <br /> � E16890 <br /> 0 LOCATIONS) /21 <br /> ��FCTR\GP�\F` <br /> z <br /> a BBB lF OF CAO <br /> } E�E�EEBE� <br /> m <br /> W o - a <br /> J <br /> m <br /> CL <br /> CL <br /> ly O <br /> 0 <br /> o <br /> W <br /> U <br /> 0 14 DATA <br /> SWITCH p (N) WALL MOUNTEDO <br /> FIBER TO _ <br /> IDF ENCLOSURE American Consultin Engineers <br /> ANALOG. 6 10 12 (SEE FLOOR 12 <br /> m O 5 2 PLAN5 FOR Electrical, nc. <br /> DATA OUTLET <br /> ° ° <br /> J <br /> - - - - (TYP) QUANTITY AND - <br /> 2312 <br /> N e Alameda, Suite <br /> N a ° ° LOCATIONS) JOB Jose,San # E19147.00 26 Fax: 408/236-2316 <br /> z <br /> ¢ 13 <br /> a <br /> 0 BASEBALL OF (VOIP) CABINET eee <br /> W <br /> (CONCESSION BUILDING) _ E _ TO 5OFTBALL 2 <br /> M } TICKET BOOTH <br /> 0 <br /> z <br /> Of O <br /> (TYP) <br /> (N <br /> z <br /> C7 <br /> N <br /> 0 14 DATA o <br /> N <br /> SWITCH 0 <br /> W FIBER TO _ <br /> ANALOG. <br /> 033 12 <br /> O <br /> 0 PRE55 BOX METAL 5TUD5 <br /> W <br /> z <br /> 0 <br /> z <br /> 13 <br /> r <br /> U <br /> 0 <br /> Of BASEBALL OF (VOIP) CABINET <br /> W (BASEBALL SCOREBOARD BOOTH) <br /> U <br /> W <br /> a 24 <br /> 11W <br /> UILD N& 6YP. 50ARD <br /> 3 <br /> z SHEET TITLE <br /> 0 <br /> F- <br /> W -- <br /> b„ DATA RISER DIAGRAM <br /> 3iz- <br /> 0 <br /> z <br /> ¢ �O <br /> z <br /> V 00 <br /> TYPICAL DATA RISER DIAGRAM (FOOTBALL & SOFTBALL) o 0 <br /> Of <br /> 0 <br /> 8 <br /> 1211 PROJECT NAME <br /> 2 <br /> W E 6.1 NOT TO SCALE o <br /> W <br /> 0 <br /> 0 <br /> z <br /> Q (1) PAIR; 18 AWG <br /> FRANKLIN HIGH SCHOOL <br /> (TYP) 12" ATHLETIC IMPROVEMENTS <br /> W (N)PANEL INTRUSION <br /> KEYPAD <br /> (E) 12 PAIR TELEPHONE I 1 <br /> GABLE,OUTDOOR ADEMGO VISTA- 1288 INTRUSION <br /> w RATED 2OA( GE CONCORD 4 I I OR KEYPAD I O 0 54 <br /> --- ---^i IP`� INTRUSIONKYP ; INTRUSION SYSTEM NOTE& PROJECT ADDRESS <br /> Z I I O M OI PROVIDE DEDICATED OUTLET FOR INTRUSION ALARM CONTROL 12u <br /> 4600 E. FREMONT ST. <br /> L �TO (N) FAGP PANEL EQUIPMENT TO NEAREST ELECTRICAL PANEL.PROVIDE 2OA/IP <br /> CIRCUIT BREAKER IN PANEL AND CONNECT AS REQUIRED.UPDATE (TYP. 10) 4 <br /> W I I PANELDIREGTORY. o STOCKTON, CA 95215 <br /> L J I I bu <br /> o (U FAIR; <br /> TEL PHONEI I ' I <br /> ' O 1211 <br /> SUBMITTAL DATE <br /> MOTIONr <br /> I <br /> (E) TEL I I � 4.4" <br /> EECTOR (TYP. 4) (oil DD/50% <br /> SUBMITTAL 03/06/2020a- - - - <br /> ly - - -� <br /> a (N) HORN (TYP) <br /> Wr= DSA 100% SUBMITTAL 05/01/2020 <br /> z LOCATE IN LOCATE IN LOCATE IN LOCATE IN <br /> ¢ (2) #12 AWG CONCESSION CONCE5510N FOOTBALL SOFTBALL I I <br /> M 5TORA6E RM. 5TORAGE RM. PRE55BOX PRE55WX <br /> 0 <br /> f NOTES: <br /> 0 <br /> az <br /> OI (4) J" DIAMETER MACHINE 5CREW5 THROUGH CABINET BACK AND <br /> a 0 PLYWOOD WITH 5TO. GUT WA5HER5 UNDER ALL BOLT HEAD5 AND <br /> 0 o NUT5. U5E LOCK-NUTS OR LOCK-WA5HER UNDER NUTS N O. REVISIONS DATE <br /> ir X CO2 (N) IDF CABINET. 42"H X 24.2"W X 10"D. VERIFY 0IMEN51ON5 Q <br /> rWITH MANUFACTURER. (MAX WEIGHT 150 L55) <br /> mo Qo O3 5/8" PLYWOOD <br /> W U) <br /> V)V) <br /> a W O4 (5) #12 X 2" 5ELF-DRILLING/TAPPING 5CREW5 THROUGH a- Qw <br /> a PLYWOOD AND GYP. BOARD INTO FLANGES OF TWO 5TUD5. <br /> ly 0 Z (10 50REW5 TOTAL). EN5URE 50REW5 ARE OF 5UFFIGIENT <br /> LENGTH TO EXTEND AT LEAST THREE THREADS PAST 5TUD <br /> FLANGE. <br /> Z= <br /> 0 <br /> -� <br /> N <br /> Z� <br /> z� 2 TYPICAL INTRUSION ALARM RISER DIAGRAM 3 IDF INSTALLATION - METALSTUDSDRAWN BY CHECKED BY <br /> MG SB/ SF <br /> E6.1 NOT TO SCALE E6.1 SCALE: NOT TO SCALE <br /> 2 En DATE ISSUED SCALE <br /> 05/01 /2020 AS NOTED <br /> 0a <br /> ao- <br /> fra <br /> o!� <br /> ¢z <br /> vi¢ PROJ. NO. <br /> No 1911000-1211 <br /> SHEET NO. <br /> ww <br /> 20 <br /> CL E6. 1 <br /> -joOF <br /> <01 <br /> DRAWING NAME: \\ACEEDC2\projects\projects\Year 2019\E19147 Franklin HS Additional Athletic Improvement\ATHLETICS (Ball Fields & POOL)\E6.1-Data Riser Diagram.dwg <br /> PLOT DATE: 04-30-20 PLOTTED BY: sbuhay <br />
The URL can be used to link to this page
Your browser does not support the video tag.