PLUMBING LEGEND
<br /> DSA GENERAL NOTES GENERAL NOTES SYMBOL ABBRV. IDENTIFICATION ABBRV. IDENTIFICATION
<br /> THE INTENT OF THE CONTRACT DOCUMENTS IS TO MODERNIZE THE SCHOOL'S CAMPUS. SHOULD ANY CONDITIONS DEVELOP NOT COVERED BY THE — CW COLD WATER(DOMESTIC) ARCH ARCHITECT/ARCHITECTURAL
<br /> CONTRACT DOCUMENTS,A CONSTRUCTION CHANGE DOCUMENT DETAILING AND SPECIFYING THE REQUIRED WORK SHALL BE SUBMITTED TO AND PRE-BID SITE VISIT
<br /> APPROVED BY DSA BEFORE PROCEEDING WITH THE WORK. CONTRACTOR SHALL VISIT THE PROJECT AREA IN ORDER TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND THE REQUIREMENTS OF THE — — HW HOT WATER BLDG BUILDING
<br /> PROJECT.THE CONTRACTOR MAY CONTACT THE ENGINEER DURING THE BIDDING PHASE REGARDING CLARIFICATIONS AND PROJECT
<br /> THE SEISMIC SUPPORT AND ANCHORAGE OF THE EQUIPMENT DESCRIBED ON THESE DRAWINGS HAVE BEEN ENGINEERED BY THE ENGINEER OF REQUIREMENTS.ASBESTOS ABATEMENT IS NOT PART OF THE SCOPE. ——— HWR HOT WATER RETURN BTU BRITISH THERMAL UNIT
<br /> RECORD FOR CONFORMANCE WITH APPROPRIATE BUILDING CODES.THE ENGINEER OF RECORD WAS NOT RESPONSIBLE FOR THE EQUIPMENT SAFETY — — — — — — — V VENT CFH CUBIC FEET PER HOUR
<br /> DESIGN.
<br /> IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES,THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE TP TP TRAP PRIMER LINE CONN CONNECTION
<br /> ALL MECHANICAL AND PLUMBING EQUIPMENT SHALL BE BRACED OR ANCHORED TO RESIST A HORIZONTAL FORCE ACTING IN ANY DIRECTION USING FOR CONDITIONS OF THE JOB SITE INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK.THIS REQUIREMENT W S OR W SOIL OR WASTE ABOVE GRADE DF DRINKING FOUNTAIN
<br /> THE CRITERIA FROM CHAPTER 16A CALIFORNIA BUILDING CODE(CBC)2016. WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS.
<br /> — — W — — S OR W SOIL OR WASTE BELOW GRADE DN DOWN
<br /> WHERE ANCHORAGE DETAILS ARE NOT SHOWN ON THE DRAWINGS,THE FIELD INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE DAMAGE TO STRUCTURE OR SYSTEM TO REMAIN
<br /> STRUCTURAL ENGINEER AND THE FIELD REPRESENTATIVE OF THE DIVISION OF THE STATE ARCHITECT. CONTRACTOR SHALL REIMBURSE THE OWNER FOR REPAIR AND REPLACEMENT, INCLUDING ENGINEER'S FEES,FOR ANY DAMAGE CAUSED TO —RWL RWL RAIN WATER LEADER DWGS DRAWINGS
<br /> STRUCTURES,LANDSCAPE,SITE WORK,OR EXISTING SYSTEMS TO REMAIN,AS THE RESULT OF CONSTRUCTION OPERATIONS. OD OD OVERFLOW DRAIN (E) EXISTING
<br /> EXISTING CONDITIONS CD CD CONDENSATE DRAIN EQUIP EQUIPMENT
<br /> COMPONENT ANCHORAGE NOTES ALL EXISTING CONDITIONS ARE SHOWN BASED ON THE BEST INFORMATION AVAILABLE AT THE TIME, BUT WITHOUT GUARANTEE OF ACCURACY.THE E CAP EXT EXTERIOR
<br /> CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS,DIMENSIONS,AND BUILDING DATA AT THE JOB SITE.ANY DISCREPANCIES REQUIRING
<br /> ALL MECHANICAL AND PLUMBING COMPONENTS SHALL BE ANCHORED AND INSTALLED PER THE DETAILS ON THE DSA APPROVED CONSTRUCTION
<br /> MODIFICATION TO THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IMMEDIATELY.NO MODIFICATIONS SHALL BE MADE BY CONT CONTINUATION FD FLOOR DRAIN
<br /> THE CONTRACTOR WITHOUT PRIOR APPROVAL FROM THE ARCHITECT.
<br /> DOCUMENTS.WHERE NO DETAIL IS INDICATED,THE FOLLOWING COMPONENTS SHALL BE ANCHORED OR BRACED TO MEET THE FORCE AND SOV SHUT-OFF VALVE FIFE FINISHED FLOOR ELEVATION
<br /> DISPLACEMENT REQUIREMENTS PRESCRIBED IN THE 2016 CBC,SECTIONS 1616A.1.18 THROUGH 1616A.1.26 AND ASCE 7-10 CHAPTERS 13,26,AND 30. CONTRACTOR'S EQUIPMENT VERDE DESIGN
<br /> BALL VALVE FS FLOOR SINK
<br /> COORDINATE WITH OWNER'S REPRESENTATIVE FOR APPROVED LOCATION OF JOB SITE ACCESS,PARKING,AND LOCATION OF CONTRACTOR'S
<br /> 1. ALL PERMANENT EQUIPMENT AND COMPONENTS. EQUIPMENT AND MATERIAL STORAGE AREA.COORDINATE WITH OWNER FOR LOCATION AND PROCEDURES. GPR GAS PRESSURE REGULATOR IE INVERT ELEVATION ����ARCHREC111RE
<br /> 2. TEMPORARY OR MOVABLE EQUIPMENT THAT IS PERMANENTLY ATTACHED(EG HARD WIRED)TO THE BUILDING UTILITY SERVICES SUCH AS CIVIL ENGINEERING
<br /> ELECTRICAL,GAS,OR WATER. UTILITY SHUT-DOWNS AND CONNECTIONS UNION INV INVERT SPORT PLANNING&DESIGN
<br /> 3. MOVABLE EQUIPMENT WHICH IS STATIONED IN ONE PLACE FOR MORE THAN 8 HOURS AND HEAVIER THAN 400 POUNDS ARE REQUIRED TO BE ALL REQUIRED UTILITY SHUT DOWNS SHALL HAVE PRIOR APPROVAL FROM THE OWNER'S REPRESENTATIVE.REQUEST SHALL BE SUBMITTED WITH O P.O.C. POINT OF CONNECTION MBH 1000 BTU PER HOUR 1843 Iron Point Rd#140
<br /> ANCHORED WITH TEMPORARY ATTACHMENTS. ADEQUATE ADVANCE NOTICE PER PROJECT REQUIREMENTS.
<br /> CIRCULATION PUMP(DOMESTIC) (N) NEW Folsom,CA 95630
<br /> THE ATTACHMENT OF THE FOLLOWING MECHANICAL COMPONENTS SHALL BE POSITIVELY ATTACHED TO THE STRUCTURE,BUT NEED NOT BE tel:916A1 5.6554
<br /> DETAILED K, ASBESTOS AND ASBESTOS PRODUCTS NTS NOT TO SCALE foots 408.985.7260
<br /> THE PLANS.THESE COMPONENTS SHALL HAVE FLEXIBLE CONNECTIONS PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED THE OWNER/OPERATOR AND CONTRACTOR SHALL BE AWARE THAT BUILDINGS CONSTRUCTED PRIOR TO 1978(OR THERE ABOUT)POSSIBILITY -0� OR GATE VALVE
<br /> DUCTWORK,PIPING,AND CONDUIT. PRV PRESSURE REDUCING VALVE www•VerdeDesiynhscaom
<br /> CONTAIN ASBESTOS IN SOME EXISTING CONSTRUCTION MATERIALS,AND WILL LIKELY BE ENCOUNTERED DURING ALTERATIONS OR REMODELING.
<br /> 1. COMPONENTS WEIGHING LESS THAN 400 POUNDS AND HAVING A CENTER OF MASS LOCATED 4'-0"OR LESS ABOVE THE ADJACENT FLOOR OR UNDER CALIFORNIA TITLE 8,THE OWNER AND CONTRACTOR BOTH HAVE RESPONSIBILITIES TO DETERMINE THE EXISTENCE OF ASBESTOS WHA WATER HAMMER ARRESTOR P/T PRESSURE/TEMPERATURE
<br /> ROOF LEVEL THAT DIRECTLY SUPPORTS THE EQUIPMENT. CONTAINING MATERIALS IN AREAS TO BE ALTERED OR REMODELED PRIOR TO COMMENCEMENT OF WORK AND TO TAKE APPROPRIATE MEASURES + HB HOSE BIBB RPM REVOLUTIONS PER MINUTE
<br /> 0 2. COMPONENTS WEIGHING LESS THAN 20 POUNDS,OR IN THE CASE OF DISTRIBUTED SYSTEMS,LESS THAN 5 POUNDS PER FOOT,WHICH ARE TO PROTECT PERSONNEL.CAL-OSHA HAS JURISDICTION OVER ASBESTOS RELATED WORK.ASBESTOS RELATED WORK SHALL BE DONE IN
<br /> SUSPENDED FROM A ROOF OR FLOOR OR HUNG FROM A WALL. RV RELIEF VALVE STAMP
<br /> ACCORDANCE WITH CALIFORNIA GENERAL INDUSTRIAL SAFETY ORDERS,TITLE 8,SECTION 341.6 THROUGH 341.14.ASBESTOS IN THE WORK T&PRV TEMP.&PRESS.RELIEF VALVE
<br /> ENVIRONMENT IS REGULATED BY TITLE 8,SECTION 5208. SOV SHUT-OFF VALVE -WDSC,gpF
<br /> z FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON THE APPROVED DRAWINGS,THE INSTALLATION SHALL BE SUBJECT TO THE APPROVAL ��C.� ��$,BAG/NS 'gyp
<br /> OF THE STRUCTURAL ENGINEER OF RECORD AND THE DSA DISTRICT STRUCTURAL ENGINEER.THE PROJECT INSPECTOR WILL VERIFY THAT ALL ALL BUILDING MATERIALS MUST BE ASBESTOS FREE SPEC SPECIFICATION �� ��` 4/
<br /> a COMPONENTS AND EQUIPMENT HAVE BEEN ANCHORED IN ACCORDANCE WITH ABOVE REQUIREMENTS. OR —C� ANGLE VALVE No. 4W9
<br /> >_ SQ DOCUMENTS DO NOT ADDRESS CONTAINMENT FOR EXISTING AREAS OF ASBESTOS WHICH MAY BE DISCOVERED DURING CONSTRUCTION. SQ SQUARE
<br /> z THE OWNER'S ABATEMENT SUBCONTRACTOR IS SOLELY RESPONSIBLE FOR THE DETECTION,REMOVAL,AND THE DISPOSAL OF ANY EXISTING CLW
<br /> R ASBESTOS MATERIAL.ARCHITECTURAL AND ENGINEERING FEES FOR ADDITIONAL DESIGN EFFORT TO OBTAIN STATE APPROVALS,AS WELL AS THE �� TYP TYPICAL
<br /> w
<br /> In COST OF ANY REPAIRS,FOR DAMAGE CAUSED OR REPLACEMENT OF EXISTING SYSTEMS TO REMAIN,DUE TO WORK PERFORMED BY THE ASBESTOS �� CKV CHECK VALVE ynaturo
<br /> PIPING DUCTWORK AND ELECTRICAL DISTRIBUTION SYSTEM BRACING NOTE ABATEMENT SUBCONTRACTOR,SHALL BE THE RESPONSIBILITY OF SAID SUBCONTRACTOR UON UNLESS OTHERWISE NOTED EXPIRATION DATE:
<br /> o > > fx JULY 2019 Q.
<br /> U VTR VENT THROUGH ROOF
<br /> CONSTRUCTION SCHEDULING OR GC GAS COCK
<br /> PIPING,DUCTWORK,AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACED TO COMPLY WITH THE FORCES AND DISPLACEMENTS PRESCRIBED W/ WITH qTF�F CA1-�
<br /> 0 CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION OPERATIONS WITH OWNER'S REPRESENTATIVE PRIOR TO SCHEDULING AND START OF THE
<br /> IN ASCE 7-10 SECTION 13.3 AS DEFINED IN ASCE 7-10 SECTION 13.6.5.6, 13.6.7, 13.6.8,AND 2016 CBC,SECTIONS 1616A.1.24, 1616A.1.25,AND 1616A.1.26. WORK.CONTRACTOR SHALL PROVIDE PROTECTION TO ALL EXISTING SPACES AND SYSTEMS WHICH ARE IN USE,ADJOINING THE PROJECT,AND NOT GCOIFCO GRADE CLEAN—OUT/FLOOR CLEAN-OUT WH WATER HEATER
<br /> a PART OF THE PROJECT. CONSULTANT
<br /> Z THE METHOD OF SHOWING BRACING AND ATTACHMENTS TO THE STRUCTURE FOR THE IDENTIFIED DISTRIBUTION SYSTEM AREAS NOTED BELOW. C-41 WCO WALL CLEAN-OUT
<br /> o WHEN BRACING AND ATTACHMENTS ARE BASED ON A PREAPPROVED INSTALLATION GUIDE(E.G.,SMACNA OR OSHPD OPM),COPIES OF THE BRACING TITLE 24 COMPLIANCE pFESS/
<br /> w SYSTEM INSTALLATION GUIDE OR MANUAL SHALL BE AVAILABLE ON THE JOBSITE PRIOR TO THE START OF AND DURING THE HANGING AND BRACING THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS THAT THE WORK OF THE ALTERATION,REHABILITATION OR RECONSTRUCTION IS TO BE IN QR ON
<br /> o OF THE DISTRIBUTION SYSTEMS.THE STRUCTURAL ENGINEER OF RECORD SHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE T THERMOMETER `v0 F A / 9�
<br /> ACCORDANCE WITH TITLE 24,CALIFORNIA CODE OF REGULATIONS(2016 CBC).SHOULD ANY EXISTING CONDITIONS BE DISCOVERED NOT COVERED
<br /> i HANGER AND BRACE LOADS. BY THE CONTRACT DOCUMENTS WHERE IN THE FINISHED WORK DOES NOT COMPLY WITH 2016 CBC,A CONSTRUCTION CHANGE DOCUMENT OR A CIO �' y
<br /> SEPARATE SET OF PLANS AND SPECIFICATIONS,DETAILING AND SPECIFYING THE REQUIRED WORK,SHALL BE SUBMITTED TO AND APPROVED BY 0 rn
<br /> $
<br /> MECHANICAL PIPING(MP), MECHANICAL DUCTS(MD),PLUMBING PIPING(PP),ELECTRICAL DISTRIBUTION SYSTEMS(E): THE DSA BEFORE PROCEEDING WITH THE WORK. "'
<br /> w No. 3 14
<br /> M MP[:]MDO PP[:] E[:] -OPTION 1:DETAILED ON THE APPROVED DRAWINGS WITH PROJECT SPECIFIC NOTES AND DETAILS.
<br /> r DRILLED IN EXPANSION ANCHORS EXP.JUNE 30,2021
<br /> a WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER DRIVEN PINS IN EXISTING NON-PRESTRESSED REINFORCED CONCRETE,USE CARE AND d' �FCHAN1pPy �Q
<br /> r MP�MDO PP�X E� OPTION 2:SHALL COMPLY WITH THE APPLICABLE OSHPD PRE APPROVAL(OPM:) CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING REINFORCING BARS.WHEN INSTALLING THEM INTO EXISTING PRESTRESSED CONCRETE >
<br /> M
<br /> OPM-0043-13,"MASON WEST,INC.SEISMIC RESTRAINT GUIDELINES FOR SUSPENDED DISTRIBUTION SYSTEMS"OR (PRE-OR POST-TENSIONED),LOCATE THE PRESTRESSED TENDONS BY USING A NON-DESTRUCTIVE METHOD PRIOR TO INSTALLATION.EXERCISE EXHAUST FANS ATF OF cAVW
<br /> ti OPM 0052 13,"B LINEITOLCO SEISMIC RESTRAINT SYSTEMS GUIDELINES" EXTREME CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE TENDONS DURING INSTALLATION.MAINTAIN A MINIMUM CLEARANCE OF ONE
<br /> iii INCH BETWEEN THE REINFORCEMENT AND THE DRILLED-IN ANCHOR AND/OR PIN. FAN MOTOR
<br /> 05/01/2020
<br /> o' MP❑MD❑PP E -OPTION 3:SHALL COMPLY WITH THE SMACNA SEISMIC RESTRAINT MANUAL,OSHPD EDITION(2009),INCLUDING ANY
<br /> 0 ADDENDA.FASTENERS AND OTHER ATTACHMENTS NOT SPECIFICALLY IDENTIFIED IN THE SMACNA SEISMIC UNIT TAG CONTROLS
<br /> WT LBS MAKE&MODEL REMARKS
<br /> o RESTRAINT MANUAL,OSHPD EDITION ,ARE DETAILED ON THE APPROVED DRAWINGS WITH PROJECT SPECIFIC CFM ESP RPM SONES HP BHP V/PH
<br /> NOTES AND DETAILS.THE DETAILS SHALL ACCOUNT FOR THE APPLICABLE SEISMIC HAZARD LEVEL AND
<br /> $ CONNECTION LEVEL FOR THE PROJECT CONDITIONS. LISTO F GOVERNING CODES GREENHECK
<br /> W EF-1 500 0.20 1550 4.4 1/30 .02 115/1 LIGHT SW 26 1,2,3,4
<br /> G-090-VG
<br /> W 2016 BUILDING STANDARDS ADMINISTRATIVE CODE,PART 1,TITLE 24,C.C.R.
<br /> W 2016 CALIFORNIA BUILDING CODE(CBC),PART 2,TITLE 24,C.C.R. EF-2 500 0.20 1550 4.4 1/30 .02 115/1 LIGHT SW 26 GG 090-VG K 1,2,3,4
<br /> 0° 2016 CALIFORNIA ELECTRICAL CODE,PART 3,TITLE 24,C.C.R. CYPRESS
<br /> a 2016 CALIFORNIA MECHANICAL CODE(CMC),PART 4,TITLE 24,C.C.R. Engineering Group
<br /> v=, 2016 CALIFORNIA PLUMBING CODE(CPC),PART 5,TITLE 24,C.C.R. 1. PROVIDE BACK DRAFT DAMPER&MANUFACTURER PREFABRICATED ROOF CURB.
<br /> 3 2016 CALIFORNIA ENERGY CODE(CEC),PART 6,TITLE 24,C.C.R. 2. PROVIDE SPEED CONTROLLER. MANUAL STARTERS&WEATHERPROOF DISCONNECT SWITCHES. HVAC,Plumbing,Fire Protection 1
<br /> 0 2016 CALIFORNIA FIRE CODE(CFC),PART 9,TITLE 24,C.C.R. 3. PROVIDE"ON/OFF"SWITCH OUTSIDE THE ENTRANCE DOOR 831.218.1802 Building Commissioning 1
<br /> 0 2016 CALIFORNIA REFERENCED STANDARDS CODE,PART 12,TITLE 24,C.C.R. 4. SEE 4/MP6.0 FOR ROOF INSTALLATION 8 Harris Court,Suite A8 Industrial Refrigeration 1
<br /> TITLE 19,C.C.R.,PUBLIC SAFETY,STATE FIRE MARSHAL REGULATIONS. Monterey,CA 93940 Environmental Compliance 1
<br /> cypresseg.com Training&Techncial Support 1
<br /> z 2016 NFPA 13 AS AMENDED
<br /> W 2016 NFPA 54 AS AMENDED.
<br /> z
<br /> a
<br /> ALL SECTION NUMBERS BELOW REFER TO GROUP 1,CHAPTER 4,PART 1,TITLE 24,C.C.R.
<br /> a 1. ADDENDA,CONSTRUCTION CHANGE DOCUMENTS PER SECTION 4-338.
<br /> z 2. INSPECTOR APPROVED BY DSA. INSPECTOR AND CONTINUOUS INSPECTION OF WORK PER SECTION 4-333(b)AND 4-342.
<br /> W 3. TESTS AND TESTING LABORATORY PER SECT.4-335.
<br /> 4. SPECIAL INSPECTION PER SECT.4-333(c).
<br /> W 5. CONTRACTOR SHALL SUBMIT VERIFIED REPORTS PER SECT.4-336 AND 4-343(c).
<br /> 6. ADMINISTRATION OF CONSTRUCTION PER PART 1,TITLE 24,C.C.R.-DUTIES OF ARCHITECT,STRUCTURAL ENGINEER OR
<br /> PROFESSIONAL ENGINEER PER SECT.4-333(a)AND 4-341.
<br /> ti 7. GOVERNING CODES:TITLE 24.
<br /> 0 8. A COPY OF PARTS 1,2,3,4,AND 5 OF TITLE 24 SHALL BE KEPT AVAILABLE IN THE FIELD DURING CONSTRUCTION.
<br /> 9. DSA SHALL BE NOTIFIED OF START OF CONSTRUCTION PER SECT.4-331.
<br /> z 10. SUPERVISION BY THE DIVISION OF STATE ARCHITECTS PER SECT.4-334.
<br /> W
<br /> o'
<br /> m
<br /> o.
<br /> W
<br /> U
<br /> a
<br /> rn
<br /> w
<br /> o SHEET TITLE
<br /> F
<br /> U
<br /> W
<br /> ZZ
<br /> O
<br /> SCHEDULES,
<br /> z
<br /> z LEGENDS, AND
<br /> O
<br /> SPECS
<br /> 0
<br /> W PROJECT NAME
<br /> 0
<br /> W
<br /> D
<br /> z FRANKLIN HIGH SCHOOL
<br /> z
<br /> 0
<br /> ATHLETIC IMPROVEMENTS
<br /> W
<br /> D
<br /> Q
<br /> W
<br /> d'
<br /> U
<br /> w
<br /> m
<br /> PROJECT ADDRESS
<br /> z
<br /> a
<br /> 4600 E. FREMONT ST.
<br /> w
<br /> STOCKTON, CA 95215
<br /> 0
<br /> W
<br /> C
<br /> fid'
<br /> W
<br /> 0 SUBMITTAL DATE
<br /> o DD/50% SUBMITTAL 03/06/2020
<br /> a
<br /> w
<br /> DSA 100% SUBMITTAL 05/01/2020
<br /> z
<br /> z
<br /> a
<br /> r
<br /> m
<br /> 0
<br /> w
<br /> 0
<br /> O
<br /> K 6
<br /> <Z
<br /> Z Z
<br /> 0U
<br /> o NO. REVISIONS DATE
<br /> 0
<br /> ti0
<br /> r
<br /> M o Q
<br /> 0
<br /> Hzo
<br /> W N
<br /> W� Q
<br /> W
<br /> m o_W
<br /> �z Q
<br /> U
<br /> Z_O 0V)
<br /> Q
<br /> J�
<br /> a�
<br /> 0o DRAWN BY CHECKED BY
<br /> a�'
<br /> SI CS
<br /> w o DATE ISSUED SCALE
<br /> <a 05/01 /2020 AS NOTED
<br /> re
<br /> ai a PROJ. NO.
<br /> FnU_ 1911000-1211
<br /> CZ
<br /> 0 o SHEET NO.
<br /> MPO. 1
<br /> OF
<br /> <0
<br /> DRAWING NAME: G:\Shared drives\HVAC\ACE Projects\19098 — Franklin HS Pool Proj\Drawings\Franklin HS Dwg.dwg SCHEDULES LEGENDS & SPEC S
<br /> 01 AT AATC. AA-2A_7A 01/ATTCA QV. Q_#_