Laserfiche WebLink
PROVIDE MIN 22 FT2 COMBUSTION AIR LOUVER MINIMUM <br /> DIMENSIONS: <br /> (1)LOUVER WITHIN 12"OF CEILING(36"W x 42"H) 8X10 STAINLESS STEEL EXHAUST DUCT TO EF-1 ON <br /> (1)LOUVER WITHIN 12"OF FLOOR(36"W x 42"H) ROOF. INSTALL FLUSHED WITH WALL.SUPPORTED <br /> SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND WITH UNISTRUD SYSTEM.TERMINATE AT 6"AFF WITH <br /> BIRD SCREEN <br /> SIZES <br /> - - — — — — — — — — — — — — z <br /> PROVIDE 12"0 FLUE TERMINATED ON <br /> ROOF WITH VENT FLUE CAP. INSTALL PER <br /> BOILER MFG'S RECOMMENDATIONS <br /> � � O <br /> 0 0 <br /> VERDE DESIGN <br /> _ EF-1 LANDSCAPE ARCHITECTURE <br /> \/ CML ENGINEERING <br /> PROVIDE MIN 4 FT' FRESH AIR LOUVER SPORT PLANNING&DESIGN <br /> I WITHIN 6"OF CEILING. 1843 Iron Point Rd#140 <br /> SEE ARCH.DRAWING FOR DIMENSIONS Folsom,CA 95630 <br /> &LOCATIONS tel:916A1 5.6554 <br /> fax:408.985.7260 <br /> ° ° I , www.VordeD4Wgninc.com <br /> ° ° <br /> ° ° / \ O <br /> I <br /> O 1 I STAMP <br /> I L_ �p,NDSCgpF <br /> ' Q� t��,S.BAGINs��'Qp <br /> a PROVIDE LABEL NEXT TO THE No. 4Q$9 <br /> z EXHAUST FAN SWITCH TO READ AS �^ <br /> ZIILU <br /> o "TURN ON EXHAUST FAN BEFORE <br /> WENTERING" y ynaturo <br /> V T EXPIRATION DATE. <br /> o ° ° 1h JULY 20190 OF <br /> Q. <br /> Cn <br /> ° �qTF <br /> J <br /> ° ° / <br /> a c I /\ I — — — — —— — —J CONSULTANT <br /> Z L <br /> EF-2 ��O�O ASS/ SNq`� <br /> Z • CO <br /> g 8X10 STAINLESS STEEL EXHAUST DUCT TO EF-2 ON LU m <br /> ROOF. INSTALL FLUSHED WITH WALL.SUPPORTED No. 3 14 <br /> WITH UNISTRUD SYSTEM.TERMINATE AT 6"AFF WITH <br /> } � EXP.JUNE 30,2021 <br /> z • BIRD SCREEN <br /> m �1or CP �FOHANICN'/ \ ATF OF CA1.W <br /> W <br /> y � <br /> d o VOV • <br /> / \ 05/01/2020 <br /> K <br /> 0 <br /> 0: �1� 0 0W <br /> G O <br /> 2PROVIDE MIN 4 FT YPRESS <br /> FRESH AIR LOUVER <br /> a U � WITHIN 6"OF CEILING. <br /> Engineering G r O U pN � O <br /> SEE ARCH.DRAWING FOR DIMENSIONS <br /> a z &LOCATIONS <br /> HVAC,Plumbing,Fire Protection 1 <br /> a 831.218.1802 Building Commissioning 1 <br /> 0 8 Harris Court,Suite A8 Industrial Refrigeration 1 <br /> 0 <br /> Monterey,CA 93940 Environmental Compliance 1 <br /> z cypresseg.com Training&Techncial Support 1 <br /> PROVIDE MIN 22 FT2 COMBUSTION AIR LOUVER MINIMUM DIMENSIONS: <br /> z (1)LOUVER WITHIN 12"OF CEILING(36"W x 42"H) <br /> Q �� 1 POOL BOILER ROOM PLAN — MECHANICAL SEERLOUVERARCHITECHIN TURAL <br /> DRAWINOF GS <br /> FOR <br /> LOC42"ATIONS <br /> of <br /> a �jT SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND SIZES <br /> y M P2.0 SCALE: 1/2" = 1'-0" <br /> W <br /> Cn0 <br /> Q <br /> W <br /> 0 <br /> U <br /> Cn <br /> U- <br /> 0 RISE PIPE ABOVE <br /> o <br /> FOOTING,PENETRATE I <br /> Z WALL,AND RISE ON i <br /> INTERIOR WALL. cD <br /> U <br /> a <br /> U <br /> o F) <br /> a <br /> c INSTALL WITH <br /> ISOLATION VALVE <br /> U <br /> W <br /> a- <br /> V) <br /> 0 <br /> w <br /> o SHEET TITLE <br /> F <br /> L) <br /> z <br /> z <br /> 8 POOL BOILER ROOM <br /> Z <br /> 0 <br /> PLAN <br /> Z SEE 1/MP6.0 FOR <br /> W THE GAS PIPE <br /> En <br /> RUN 1"CD TO SUPPORT <br /> o FLOOR SINK,SPILL <br /> w TO FLOOR SINK PROJECT NAME <br /> o WITH AIR GAP,TYP <br /> oOF 2 BOILERS to Q <br /> z FRANKLIN HIGH SCHOOL <br /> o FACTORY NEUTRALIZER KIT, <br /> TYP OF 2 BOILERS ATHLETIC IMPROVEMENTS <br /> o <br /> w <br /> Uj <br /> ° ° CONNECT 1/2"CD TO BOILER <br /> U 0 o AND RUN TO NEUTRALIZER KIT, <br /> Uj ° ° TYP OF 2 BOILERS \ <br /> ° ° DROP 1 1/2"G TO BOILER, <br /> o CONNECT TO BOILER WITH \ 0 PROJECT ADDRESS <br /> Q GAS 1 LEG,TOPOF210N,ANDDIRT o 4600 E. FREMONT ST. <br /> U <br /> Z <br /> W 1Y"MPG 1�"MP gs <br /> ® � STOCKTON, CA 95215 <br /> W 7 GAS PRESSURE REGULATOR:AMERICAN METER <br /> MODEL 1813C,2 PSI INLET,7WC OUTLET,1520 <br /> CFH,TYP OF 2 BOILERS.RUN VENT PIPE TO THE <br /> ROOF,TERMINATE WITH RAIN COVER. <br /> U- I <br /> 0 SUBMITTAL DATE <br /> o ° ° I DD/50% SUBMITTAL 03/06/2020 <br /> o: ° 1 <br /> a <br /> Uj <br /> ®II O • — ` • 1 • DSA 100%SUBMITTAL 05/01/2020 <br /> z o <br /> } C <br /> o 0 <br /> M <br /> 0 <br /> W <br /> O <br /> Ir U <br /> QZ <br /> Z� <br /> ofo I NO. REVISIONS DATE <br /> 0 <br /> �® <br /> m 0 0 0 <br /> o Qzo o <br /> WN \ <br /> WN Q <br /> Ww <br /> o <br /> Uj <br /> Uja <br /> �z Q <br /> 00 00 <br /> LU <br /> (L <br /> ZP Lu M \ DRAWN BY CHECKED BY <br /> M Oz \ S1 CS <br /> M o DATE ISSUED SCALE <br /> <a 05/01 /2020 AS NOTED <br /> v;< PROJ. NO. <br /> 00 1911000-1211 <br /> Ld <br /> az <br /> '�O 2 POOL BOILER ROOM PLAN — PLUMBING SHEET NO. <br /> �Tti <br /> 90 M P2.0 SCALE: 1/2" = 1'-0" M P 2.0 <br /> OF <br /> QU <br /> DRAWING NAME: G:\Shared drives\HVAC\ACE Projects\19098 — Franklin HS Pool Proj\Drawings\Franklin HS Dwg.dwg POOL BOILER ROOM PLAN <br /> P1 nT nATF• nn_zn_')n of r)TTFn QV. Cofn <br />