Laserfiche WebLink
VERDE DESIGN <br /> LANDSCAPE ARCHITECTURE <br /> CIVIL ENGINEERING <br /> SPORT PLANNING&DESIGN <br /> 1843 Iron Point Rd #140 <br /> Folsom,CA 95630 <br /> tel:916.415.6554 <br /> fox:408.985.7260 <br /> www.VerdeDesigninc.com <br /> a <br /> 0 STAMP <br /> z <br /> 0 <br /> Uj <br /> w <br /> a <br /> r <br /> z <br /> a <br /> 0 <br /> 0 <br /> w <br /> O <br /> J <br /> U <br /> N <br /> D <br /> of <br /> O <br /> H <br /> CL CONSULTANT <br /> Z � I <br /> 0 <br /> w <br /> J <br /> 2 <br /> Z <br /> S TRUCTURAL ENGINEERS, INC. <br /> Ld 1505 MERIDIAN AVE, SUITE B PHONE 408.978.1970 <br /> z SAN JOSE, CALIFORNIA 95125 FAX 408-267-7919 <br /> } WWW.AKHSE.COM AKH JOB M19-071 <br /> M <br /> 0 <br /> Ld <br /> M QROFESS/O14 <br /> i <br /> cm <br /> 0 <br /> Ld <br /> No. S3260 <br /> U <br /> 0 <br /> EXP. 3/31/21 <br /> 0 <br /> of <br /> rT STRUCT\3?' <br /> o qPe OF CNO\ '3\ <br /> NOTE: ALTERNATE THICKENED SLAB, <br /> REINFG & DOWELS <br /> HORIZ. BARS EA. WHERE OCCURS, <br /> SIDE OF VERTS. TYP. 24" <br /> • 8' CMU WALL 15 15 16 15 PER DET. <br /> N #5 HORIZ. BARS S4.1 S4.1 S4.1 S4.1 12" HOOK 20 CMU WALL BEYOND <br /> #5 VERTICAL BARS @ SEE DETAIL SEE DETAIL SEE DETAIL IN WALL ———— — ———— S4.1 <br /> Z @ 24"o.c., TYP. PARTIAL- OR FULL-HEIGHT 24" <br /> 16'o.c., CENTERED IN FOR INFORMATION FOR INFORMATION FOR INFORMATION - — — — — — — — — — - <br /> WALL AS OCCURS, PER PLAN <br /> WALL, TYP., U.N.O. NOT NOTED NOT NOTED NOT NOTED <br /> & SECTIONS CONT. #4 EMBEDDED <br /> \ \ \ \ <br /> o ROUGHEN CONC. TO #5 WALL DOWELS @ 16"o.c. ;\�\\ \ \/ TYP. 6" SLAB BARS 20" INTO CMU, EACH #4 SLAB DOWEL x AS READ. <br /> 1/8 AMPLITUDE \\ \\ \\ CONT. TO WALL SIDE OF OPENING @ 24'o.c. <br /> AND CLEAN PRIOR W/ STD. HOOK AT BOTTOM 24 CMU WALL BEYOND <br /> THICKENED SLAB BARS PER <br /> OF FTG., TYP., U.N.O. 33" 24" \//\\ <br /> TO INSTALLING CMUA #4 SLAB DOWEL x CONT. #4 EMBEDDED \ `\-�\ \ <br /> a 24" 12" HOOK w/ #3 @ 12"o.c. /\//�//\//\// • <br /> of <br /> /\ #4 SLAB DOWEL /\/\ <br /> a #4 SLAB DOWEL 33' IN WALL r, <br /> a EXT. GRADE z 9 THICK SLAB ' ' //j/ @ 24"o.c. TOP BARS EA. WAY HOLD GROUT <br /> N OR PAVING @ 24"o.c. 30„ @ 24"o.c. EA. SIDE 20' INTO CMU, EACH #4 SLAB DOWEL a j\\j <br /> Uj <br /> OF WALL SIDE OF OPENING @ 24'o.c. > \//\ DOWN 1" C� <br /> Lr, \ \ BREAK OUT FACE SHELL \ <br /> / / 4" U.N.O. / <br /> AS OCCURS \/ / " / <br /> N /\\/\\ 6 AFTER GROUTING CMU, CONT. <br /> N 12" PER \ '\%\%\\%\ \\\%\\%\\% % %\\ / /6 15 18 <br /> 2" CLR. AT \ \ \ \ \ \ \ \ \ \ ` \ \ \ \ <br /> PLAN \/\/\/\ 15' PER //\//\//\//\//\ /\//\//\/ \//\// 15 /`//\//\// <br /> TOP, TYP. 00 6" CRUSHED ROCK PLAN i/\jj\jj\jj\jj\\ \\jj\\jj\\jj\\j \\jj\\jj\j /\�j\\j\\j\\j SEE DETAILS S4.1 S4.1 <br /> \ \/\ TION <br /> ` \ SEE DETAIL � \\ \\ \\ \\ FOR INFORMA <br /> /\\/\\/\\/\\/\\/\ /\\//\\ \\/\\ /\\' FOR INFORMATION \\/\\/\\/\\' \\/\\/ / / NOT NOTED <br /> w \ FIRST COURSE SHALL BE INVERTED, //\ '�//\//\//\//\//\ i\//\/ — — — — — — — — — //\/ \// \ \ , \// <br /> Z \\ \\ /\\ /\\/\\/\\/ /\\�`� \/\\/\\/\\/\\/\ \/\\/ /\\ \\ \\/ /\\/\\ /\\/\\ /\\/\ NOT NOTED \\/\\/\\� 15 19 `/\\/\\/ • <br /> //` /jam/ OPEN-END BOND BEAM UNITS, TYP. /j\ /jam/jam/j�/j j �//jam/jam/jam/j /j�/j j� 9" SLAB & %/% /\/\//\/ \�/%/%/ $/% <br /> CONC. PERIMETER FOOTING %\�/%\ /jam/jam/j�/j 9" THICK SLAB \�//�//�// //�//\\ 9'; THICK SLAB OVER \//\�//\� DROPPED ROCK ���/�\�/�\� \�/�� j\�/j\�/j\�/ \��/j\�;\ SEE DETAILS S4.1 S4.1 j\�//\�\\// <br /> w //\\//\ //\// \//\\ /\\//\\//�\ OVER 6 CRUSHED j\\//\\//\\ //\\//\\i 6 CRUSHED ROCK //\//\/ AT SIM. DETAIL \//\//\/ \//\ /\//\//\// \//\r FOR INFORMATION \// <br /> `� j\//\\//\ // BOTTOM, TYP., UN.O. /\\\ /\\%/`\ ROCK \%/\\%/\\ %j\%j\i %/\\%/\\% \%/\\%/\\% \%j %/\\%/\\%/\\%/ \i` NOT NOTED %j\ <br /> \\j\\j\ / <br /> \%\\%\ 00 <br /> #4 CLOSED TIES @ <br /> �' \ \ 24"0.c., TYP., U.N.O. <br /> a % \/\\/\ ij/j\ /j\ j\//\/ /j\/j <br /> 1. 1 -777777 777777 <br /> 3" CLR. AT BOTTOM <br /> 00, <br /> 24", TYP., U.N.O. & SIDES, TYP. <br /> z SHEET TITLE <br /> 0 <br /> w15 CMU WALL and FOOTING16 CMU WALL and FOOTING CMU WALL and FOOTING SLAB AT WALL DOOR OPENINGS CMU WALL at STEPPED FOOTING CMU WALL at THICKENED SLAB STEPPED FTG21 . AT WALL OPENING POOL EQUUIP. BLDG. <br /> Z <br /> z <br /> STRUCTURAL <br /> U1718 <br /> Z 3/4" = 1'-0" 3/4" = 1'-0" 3/4" = 1'-0" 3/4" = 1'-0" 3/4" = 1'-0" 3/4" = 1'-0" 3/4" = 1'-0" <br /> FOUNDATION & CMU <br /> Z <br /> Ld <br /> 1/2"0 X 6" WALL DETAILS <br /> a HEADED STUD EA. <br /> SIDE OF COL. <br /> a PROJECT NAME <br /> w CONC. CAP. w/ 3/16 <br /> Ld <br /> #4 CONT. • <br /> Q CLOSURE/FORM FRANKLIN HIGH SCHOOL <br /> 8" CMU CMU PIT WALL COLUMN, EANSIDE ATHLETIC IMPROVEMENTS <br /> o WALL BEYOND <br /> w 8" NET TO MATCH <br /> WALL VERTICAL CURB WIDTH <br /> Q REINFORCING 8" CMU PLAN AT CURB <br /> 3/4" CHAMFER, TYP. <br /> EXTENDED INTO WHERE INTERIOR WALL <br /> 0 STEEL COLUMN <br /> w 12" WALL BELOW OCCURS, PROVIDE WALL C.L. COLUMN a • <br /> w INTERSECTION BARS AT BASE 32 #4 CONT. CONC. THICKENED SLAB ° 2"CLR., TYP. <br /> EXTERIOR GRADE CONC. CAP PER 13 PLATE 24 CURB BEHIND 4" & A.B.s PROJECT ADDRESS <br /> 0 S4.1 #4 SLAB DOWEL <br /> @ 24"o.c. 32„ — — — — — — — — - 33" PROVIDE MIN. #3 <br /> 29 4 SEE OTHER DRAWINGS FOR 4600 E. F R EMO N T ST. <br /> Z \ \ \ \ \ \ \ \\ — — — - — — — — — — — S4.1 @ 12"o.c. EA. REINF. PER AQUATIC a #5 HORIZONTAL @ <br /> 0 12"± %//�//�//�//�/j//�//\ SEE DET. WAY AT TOP OF EQUIPMENT DWGS EXPANSION / SCORE JOINTS 18"o.c. EACH FACE STOCKTON CA 9521 5 <br /> w �j\\j\\j\\j\\ FOR ITEMS NOT PAD <br /> w \\ \\ \\ #4 CONT. SHOWN OR NOTED 3/16 • ° • CONCRETE WALL <br /> // // MIN. #3 @ 12 o.c. <br /> w \j�\j�\ 12" CMU CENTERED <br /> \�//\\//\\// ON FOOTING HOLD GROUT ALL AROUND PAD Q 4 <br /> U_ i//\//\//\ DOWN 1" FROM - - <br /> } %�\%�\%� TOP OF CMU #4 CURB DOWEL BACKWASH PIT AS REQUIRED a SUBMITTAL DATE <br /> F__ <br /> \//�\//�\//�\ o, @ 16"o.c. 30' 12" HOOK BASE PL. 3/8" x 7" x BY PUMP MFR. #5 VERTICAL @ <br /> a / / / i IN WALL - 16"o.c. EACH FACE DD/50% SUBMITTAL 03/06/202 <br /> \j\\j\\j\\ ; , - 11" w 2 3 4"0 A.B.s <br /> 8" CMU WALL / ( ) / <br /> \ \ 3" TYP. (2) #5 AT TOP �" TO CMU WALL <br /> #5 HORIZ. BARS #5 HORIZ. BARS ° DSA 100% SUBMITTAL 05/01/202 <br /> 0 / j @ 24"o.c. E.F. @ 24"o.c• °O \\\�\\�\\�\��\�� \/\\ \\ <br /> ��\i/ PLAN AT BASE PL. <br /> \\ \ PUMP PIT #5 VERTICAL BARS PUMP PIT o ��� , SI AIR B REINF. PER PLAN <br /> @ 16"o.c., ROUGHEN TOP OF FOOTING TO #5 WALL DOWELS @ 16"o.c. EACH FACE <br /> o #5 VERTICAL BARS @ 16"o.c., PROVIDE STD. • DRAIN ROCK FOR #5 HORIZ. BARS 1/4' AMPLITUDE FOR WALL W/ STD. HOOK AT BOTTOM OF FOOTING <br /> BREAK OUT FACE PUMP PAD AND SLAB ABOVE z <br /> 12"± E.F., PROVIDE STD. HOOK AT HOOK AT BOTTOM FULL HEIGHT OF @ 24"o.c. 6„ SHELL AFTER HEADED STUD 1/2" x 12" EXPANSION JOINT MATERIAL <br /> a z TYP. / _ <br /> BOTTOM OF FOOTING OF FOOTING WALL, TYP. GROUTING CMU, CONT. 3 4 = 1 -0 AT WALLS, TYP. <br /> ZZ DRAIN ROCK, #5 VERTICAL BARS STOP CURB BARS 1" 3-1/2" FLEXIBLE <br /> Q w TYP. SLAB ON GRADE PER PLAN PERF. DRAIN PER @ 16"o.c., CLR. EACH SIDE OF _ m PAVING BY OTHERS, ° CONCRETE PAVING NO. REVISIONS DATE <br /> 0 o DRAIN ROCK FOR �, „ <br /> 24" OTHERS PROVIDE STD. COLUMN WHERE OCCURS BY OTHERS 24 <br /> D o FULL HEIGHT OF SLAB DOWELS <br /> =a #4 SLAB DOWEL HOOK AT BOTTOM <br /> PERFORATED 18" WALL, TYP. = BEYOND a #4 SLAB DOWELS x 24 <br /> o /\ @ 24'o.c., TYP. �j\\ OF FOOTING 3/16" CLO <br /> 00 III `0 AGG. BASE, TYP. ° " <br /> DRAIN BY \ <br /> 0 OTHERS / \//\' PERF. DRAIN PER o.c., <br /> w z \ \ PL. BENT ON EACH SIDE 9 <br /> Z /j\/j\ _ j�/j�/j OTHERS OF COLUMN AS SHOWN _ #3 @ 12" o.c. <br /> w /j/j//j Co \\j/j///\ \\ — — — — — — — EACH WAY o <br /> a a \\ \\ \ \\ \\� \ 3 x I@ 12" o.c. a <br /> aw /\/\/\ \/\/ \ # 9 <br /> Uj <br /> a / / / - \//\\//\\/ /\\ 1"± - NEW SLAB TYPICAL AROUND <br /> Z �o /\ \ \// /\ \� o 2" CLR. #5 @ 24'o.c. TOP <br /> o ON GRADE PAD PERIMETER ° <br /> 3 16 1 @ 5 III I 7/\\ <br /> w of / �\\ \ \\\\\\\\ • • • <br /> Q #4 TIES @ // // / // // ° a ° (4) #5 LONGIT. <br /> �� a ��\\�\\� (3) #5 CONT. CONC. FTG \\ CONC. FTG \\ \ \ #4 TIES @ 1-1/2'± NON- STIFFENER AS REQ,. TO ° \� \\�\\�\ a <br /> 0 0 / / / ///// /// /////, _ a - %////// ° °° 12" MIN., TOP BARS <br /> Z TOP & BOTTOM w/ (2) #5 \\/\\ 24"o.c. w/ (2) #5 ,\\\ \\/� 24"o.c. SHRINK GROUT SECURE CLOSURE IN PLACE a a \\\\\\\ a <br /> z \ \ ° \ \ >\ • \ z - \ \ a a a (5) #5 LONGIT. <br /> / / / / / / / HOLD CMU GROU ° %/ // <br /> J w TOP & BOT. //\//\ TOP & BOT. / r /�\/j /j\/j ° ° . .a <br /> a a �/\/\ \/\ \/ \/ iii a \ \ ° �, a <br /> \ \ / /\\% _ DOWN 1" BELOW • ° �• ° • BOT. BARS <br /> Z o i\\ /\\/\\/\\/\\/\\/\\/\\/\\/\\/\�i 3" CLR. AT BOTTOM /\\/\\/\\/\\/ //\\/\< �j\\/\\/\\/\\/\\/\\/\\/\\/\\/ //\ z /\\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\/�\\ \\ \\ \ ° a ° ° a DRAWN BY CHECKED BY <br /> a #5 TOP & BOT. \/j\/j\/j\/j\/j\/j\/j\/j\/j� AND SIDES, TYP. //\//\//\//\/\// �/ //\//\//\//\//\//\//\//\ TOP OF CMU \/\//\//\//\//\//\//\//\//\ \ \ \ \ \/\/\/,. \ \ a <br /> BARS @ 16"o.c. \//\/,\i, \\r\\i\/� , \ \j/\j\\j\\j\\j\\/\\j\\\�� <br /> \ \ \/\/\/\/\/\/ /\/�\/ #5 @ 16"o.c. BOT. <br /> � 1 (2) #5 CONT. \ /\\\\�/\\�/\\�/\\// /r / i <br /> w o S-6 CTRD. UNDER WALL 2 -0 2'-0" '\\��\ \\//\\/�\\�/ 3" CLR. BOT. & SIDES DATE ISSUED SCALE <br /> z� CTR,. UNDER WALL CTR,. UNDER WALL DRAIN ROCK ,//�/' AS SHOWN <br /> ofo- 6'-6" CENTERED UNDER WALL 05/012020 <br /> ar <br /> aZ <br /> N a PROD. NO. <br /> Z of <br /> 0 o CMU WALLS & FOOTINGS AT WELL PUMP/BACKWASH PIT WALL & FTG. COLUMN AT CMU WALL TYP. HOUSEKEEPING PAD BALL WALL SECTION 1911000-1211 <br /> (/P-- SHEET NO. <br /> w� 3/4" = 1'-0" 3/4" - 1'7" 1-1/2" = 1'-0" 3/4" = 1'-0" 3/4" = 1'-0" <br /> 20 <br /> a. <br /> S4. 1 of <br /> 'O <br /> Q U <br /> DRAWING NAME: 04—Verde DesignOTTED B Franklin HS Athletics\Dwgs\Structural\S4-1 Structural Details.dwg POOL EQUIPMENT DLDG. STRUCTURAL FOUNDATION & CMU WALL DETAILS <br /> PLOT DATE: 04-23-20 PLOTTED BY: Jose <br />