My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1991-2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
0
>
4400 - Solid Waste Program
>
PR0515734
>
CORRESPONDENCE_1991-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2025 11:32:48 AM
Creation date
9/25/2020 3:47:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1991-2001
RECORD_ID
PR0515734
PE
4430 - SOLID WASTE CIA SITE
FACILITY_ID
FA0012312
FACILITY_NAME
CITY OF TRACY LANDFILL
STREET_NUMBER
0
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303015
CURRENT_STATUS
Active, billable
SITE_LOCATION
CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Pending
Scanner
SJGOV\cfield
Supplemental fields
Site Address
CORRAL HOLLOW RD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KL€1INFfi_5�_», <br />• The PVC pipe and end caps are steam cleaned prior to installation. <br />• The annular space between the screen and the wall of the boring is backfilled with <br />the appropriate clean sand to approximately 2 feet above the top of the perforated <br />sections. Based on soil logs or a sieve test, modifications may be made regarding <br />the size of sand to be used. Installation of the sand may require that the sand be <br />tremmied, using clean water. <br />A 3- to 5 -foot bentonite plug is placed above the sand pack to provide a seal <br />against surface water infiltration and to reduce the potential for cement grout to <br />infiltrate into the water. <br />• The remaining annular space is filled to the surface with cement/bentonite grout. <br />The wells are secured in an aboveground or underground locking stovepipe. The <br />well heads may be enclosed in a water tight cement utility box set flush to the <br />ground surface when located in a traffic area. <br />B-3.2 Monitoring Well Development <br />The wells are developed to reduce the effects of drilling on the formation and to increase the <br />effective hydraulic radius of the wells. <br />Monitoring wells are generally developed 24 to 48 hours after installation to allow the grout to <br />set. Each well is first sampled with a clear disposable bailer to visually inspect for a hydrocarbon <br />layer or sheen. If no product layer or sheen is observed on the water, the well is developed by <br />surging, pumping or bailing. Surging along the screened interval of the well is performed to <br />draw the sediment from the formation into the filter pack and the well, and to set the sand pack. <br />Development continues until the discharge runs relatively clear of fines. Approximately 5 to 10 <br />well volumes are generally removed from each monitoring well. Discharge water is stored in 55 - <br />gallon drums and left on site for later discharge or disposal by the client, depending on laboratory <br />results. The drums are labeled with the date, well number, and a contact person and phone <br />number. <br />B-3.3 Equipment Decontamination <br />To reduce the potential for cross -contamination between wells, developing equipment is washed <br />in a trisodium phosphate or non -phosphate detergent solution and rinsed in distilled water or <br />steam cleaned prior to use in the next monitoring well. <br />20-YP1-611/2011P181 Page B-5 <br />Copyright 2001, Kleinfelder, Inc. July 3, 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.