Laserfiche WebLink
WASTE DISCHARGE RLOJIREMENTS ORDER NO. -16- <br /> SAN JOAQUIN COUNTY <br /> FOR POST-CLOSURE AND CORRECTIVE ACTION MONITORING <br /> CORRAL HOLLOW SANITARY LANDFILL <br /> SAN JOAQUIN COUNTY <br /> b. Date,time, and manner of sampling; <br /> c. Date and time that analyses were started and completed, and the name of the <br /> personnel and laboratory performing each analysis; <br /> d. Complete procedure used, including method of preserving the sample, and the <br /> identity and volumes of reagents used; <br /> e. Calculation of results; and <br /> f. Results of analyses, and the MDL and PQL for each analysis. <br /> 3. A transmittal letter explaining the essential points shall accompany each report. At a <br /> minimum, the transmittal letter shall identify any violations found since the last report <br /> was submitted, and if the violations were corrected. If no violations have occurred <br /> since the last submittal,this shall be stated in the transmittal letter. The transmittal <br /> letter shall also state that a discussion of any violations found since the last report was <br /> submitted, and a description of the actions taken or planned for correcting those <br /> violations, including any references to previously submitted time schedules, is <br /> contained in the accompanying report. <br /> 4. Each monitoring report shall include a compliance evaluation summary. The <br /> summary shall contain at least: <br /> a. For each monitoring point and background monitoring point addressed by the <br /> report, a description of: <br /> 1) the time of water level measurement; <br /> 2) the type of pump - or other device -used for purging and the elevation of <br /> the pump intake relative to the elevation of the screened interval; <br /> 3) the method of purging(the pumping rate; the equipment and methods used <br /> to monitor field pH,temperature, and conductivity during purging; the <br /> calibration of the field equipment; results of the pH,temperature, <br /> conductivity, and turbidity testing; and the method of disposing of the <br /> purge water)to remove all portions of the water that was in the well bore <br /> while the sample was being taken; <br /> 4) the type of pump -or other device-used for sampling, if different than the <br /> pump or device used for purging; and <br />