My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 5:04:20 PM
Creation date
9/28/2020 7:49:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N J 0 A Q I I I Irl Environmental Health Department <br /> CCUNT <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> Sprint United Managemnt Co. 3807 Coronado Ave, Stockton October 09, 2020 <br /> Single-Walled Non-Pressurized Piping <br /> 404 CCR 2643(e),2661(f) Failure to conduct 0.1 gph test on single-walled gravity piping biennially or post repair(pre-1984) ❑V ❑R ❑COS <br /> Other Violations <br /> 2010 See below Unlisted General violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 111 CCR 2637, 2638(e), 2643(g)Failed to notify the EHD 48 hours prior to conducting testing. <br /> OBSERVATION: Overfill prevention inspections were performed on October 17, 2019 without providing notification <br /> to the EHD at least 48 hours in advance. <br /> REGULATION GUIDANCE: Notification shall be provided to the CUPA at least 48 hours in advance of testing. <br /> CORRECTIVE ACTION: The EHD will not accept these results and testing must be rescheduled with a 48-hour <br /> notification. Immediately schedule these tests and provide 48 hours notification to the EHD. <br /> This is a Class II violation. <br /> 115 CCR 2638(c), 2638(d) Failure to submit"Monitoring System Certification Form"within 30 days of completion of the <br /> test. <br /> OBSERVATION:A monitoring system certification were performed on October 4, 2019. A test report has not been <br /> submitted to the EHD or the California Environmental Reporting System (CERS). <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the test. <br /> CORRECTIVE ACTION: Immediately provide this report to the EHD. <br /> This is a minor violation. <br /> 116 CCR 2637.1(d), 2637.1(e)Failure to submit the"Spill Container Testing Report Form"within 30 days. <br /> OBSERVATION:A spill container test was performed on October 4, 2019. A test report has not been submitted to <br /> the EHD or the California Environmental Reporting System (CERS). <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the test. <br /> CORRECTIVE ACTION: Immediately provide this report to the EHD. <br /> This is a minor violation. <br /> FA0003819 PR0231066 SCO01 10/09/2020 <br /> EHD 23-01 Rev.9/20/2019 Page 4 of 7 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.