Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer 8 Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum B Hydrostatic <br /> Test Equipment Used: Incon <br /> Sump/UDC ID Piping Sump Piping Sump <br /> Sump Manufacturer Xerxes <br /> Sump Depth (inches) 5211 <br /> Sump Bottom to Top of 2011 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11 :01/11 :17 <br /> Initial Reading 4.3882/4.3880 <br /> Test End Time 11 :16/11 :32 <br /> Final Reading 4.3881/4.3880 <br /> Change in Reading 0.0001/0.00 <br /> Pass/Fail Criteria 0.002 <br /> Tightness Test Results 8 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />