My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 5:04:20 PM
Creation date
9/28/2020 7:49:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGETANK <br /> MONITORING SYSTEM GERTIFICATiON FORM(Page 4 of$) <br /> VIII. MONITORING SYSTEM AND PROGRAMMING NA <br /> This section must be,completed If monitoring panel is used to perform leak detection monitoring. Y N <br /> Ara jW 13 <br /> the visual and audible alarms operational? ❑ <br /> Were all sensors visually Inspected for kinks and breaks In the cables and for rosidual buildup to ensure that floats move freely, ❑ ❑ <br /> functionally tested,and confirmed operational? <br /> Were 15 sensors installed at lowest paint of secondary containment and positioned so that other equipment will not interfere with their © ❑ <br /> pro— eA +operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? <br /> Was the monitoring panel's backup battery visually Inspected,functionally tested,and confirmed operational? ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser Containment? ❑ ❑ <br /> Claes—the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ❑ ❑ <br /> disconnectad? <br /> Does the turbine automatically shutdown ifthe piping savondary containment monitoring system detects a leak? ❑ ❑ <br /> Which sensors initiate positive shutdown? (Check all that apply.) ❑Sump ❑Under-dispenses containment <br /> If alarrns are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? ❑ ❑ <br /> Foran answerof"N"above -scribe In section!X how and when these defclendes were or will be corrected <br /> Ix. cOMI111N1 ST <br /> X. IN-TANK GAUGING TESTING <br /> �] Check this box if tank gauging is used only for inventory control.(0o not complete this section.) <br /> [] Check this box if NO tank gauging equipment is installed.(Do not complete this section.) Y N NA <br /> This section must be corn feted if in-tankiyattgIng is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination,including testing for ground ❑ ❑ <br /> faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely,functionally tested, , ❑ <br /> and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ <br /> Was accuracy of system's water levef readings tested? ❑ ❑ <br /> Were all probes reinstalled properly? ❑ <br /> El <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ El <br /> Foran answerof"N"above describe in section X1 how and when these deficiencies were or will be corrected <br /> XI. COMMENTS <br /> Y-Yes,N-No,NA=NotApplicabie <br />
The URL can be used to link to this page
Your browser does not support the video tag.