My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3304
>
2300 - Underground Storage Tank Program
>
PR0516354
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 9:36:33 AM
Creation date
9/28/2020 8:26:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0516354
PE
2361
FACILITY_ID
FA0012437
FACILITY_NAME
CHEVRON 352324
STREET_NUMBER
3304
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07120013
CURRENT_STATUS
01
SITE_LOCATION
3304 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of s) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UJI I%IUIILLVIIIlu Jnr ridij <br /> Site Address: Hammer Lane Oil — 3304 W Hammer Lane Stockton CA 952(17 <br /> STORE <br /> E-Stop <br /> C <br /> . . . . 91 <br /> Co <br /> x <br /> L DIE <br /> . _ . 87 F . . . . . <br /> F <br /> E D V <br /> KEY <br /> j X F = FILLS <br /> L T = TURELNE <br /> P = PROBE <br /> *PIEPING I . . X . . . V = V?iPOR <br /> Diamine ofpP 5 i ins L % = SIA P SENSOR <br /> IIIL = Leak Detector <br /> exit of sump and <br /> UDC's. Ao III = Afaam-ay <br /> tmdeigrouurl B = Brine Sensor <br /> dtandng is I = Smart Sensor <br /> �CSJRAt� nre S = STI* <br /> cannot speculate C = Floats Fc Chains <br /> blue prints. frit items undargrouml that are not risibla to the vert(fting tech3icimt area E = E Stop <br /> prgfassianal opinion on6l mid are sole4ti for itlformational purposes. A-aieuig <br /> { =- not to scale <br /> Date map was drawn: 8-16- 16 <br /> Instructions <br /> If you already have a diagram that shows an required information, you may include it, rather than this page, with your ldonitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors mon;toring lank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary conta;nment areas: mechanical or electronic line leak detectors; and in4ank liquid levet <br /> probes (if used far leak detection). In the space provided, note the date this Site Fan was prepared_ <br /> LEGEND <br /> IIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.