Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6 , OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 Diesel <br /> Are both vent and tank riser piping ® Yes ® Yes rl Yes 0 Yes <br /> secondarily contained ? 0 No Ej No E] No ® No <br /> OPE Model 61 SO 61 SO 61 SO <br /> What is the OPE response when Rn Shut off F1 Shut off M Shut off r! Shut off <br /> activated ? Flow Flow Flow Flow <br /> (Check all that apply.) © Restricts ® Restricts ® Restricts rj Restricts <br /> Flow Flow Flow Flow <br /> ® Audible r] Audible ® Audible ® Audible <br /> Alarm Alarm Alarm Alarm <br /> rl Visual 0 Visual ® Visual ® Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑] Yes * ® Yes * rl Yes * © Yes * <br /> that may interfere with the OPE operation ? F1 No F✓ No F1 No No <br /> At what level in the tank is the OPE set to 86 85 . 5 86 <br /> activate ? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at 94 . 7 % 94 . 3 % 94 . 7 % <br /> which the OPE activates ? <br /> Is the OPE in proper operating condition to Yes ✓1 Yes * Yes * Yes * <br /> respond when the stored substance [rj No rl No r] No No <br /> reaches the designated regulatory level ? <br /> 7 . SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results [71 Pass 0 Pass 0 Pass ® Pass <br /> 0 Fail © Fail r] Fail ® Fail <br /> 8 . COMMENTS <br /> Describe all answers marked "No " or "Fail " and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> ® Flow restrictors interfere with overfill prevention and equipment repairs required . <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s) , measurements, calculations, and In - Tank Setup report(s) <br /> Page 2 of 2 <br />