Laserfiche WebLink
a"'" \ 2 SAN JOAQUIN Department <br /> ° c� Environmental Health <br /> Q <br /> N`, �'_ , As COUNTY Linda Turkatte , REHS , Director <br /> Kasey Foley, REHS, Assistant Director <br /> ° t;Foa �P Greatness grows here . PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Michael Kith , REHS <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> August 12 , 2019 <br /> MATT THOMAS <br /> CGRS , INC <br /> 5444 DRY CREEK RD <br /> SACRAMENTO , CA 95838 <br /> Re . UNITED #5449 <br /> 322 S CENTER ST SR0080776 <br /> STOCKTON , CA 95203 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of <br /> the application for a permit to install direct- bury spill containers and overfill prevention flapper <br /> shut off valves in the 87 gasoline and 91 premium tanks on the underground storage tank ( UST) <br /> system at the above noted address . The permit has been approved with the following <br /> conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work . All new addenda supersede the previous ones . <br /> 3 . Contact Paul Nso at ( 209 ) 468 -3432 to arrange the following appointments ( a 48 - hour <br /> notice is required for inspection appointments ) . <br /> • Corrosion protection : Verify corrosion protection for direct bury spill buckets prior to <br /> backfilling . <br /> • Spill bucket test : Verify minimum 5- gallon capacity and pass a one hour hydrostatic <br /> test (or equivalent) . Proper drainage must also be verified . <br /> • Overfill prevention verification : Measurement of drop tubes to verify 95 % tank volume <br /> shut off. Verification of flapper functionality . Ensure that all pertinent tank charts and <br /> calculations are available for review at the time of inspection . <br /> • Verification that ball floats (s) , if installed , do not interfere with the installed flappers <br /> Valve . <br /> • If concrete will be broken near the 87 and 91 tanks , a secondary containment test <br /> must be performed on these tanks once concrete is poured in accordance with the <br /> manufacturer' s guidelines and test results submitted to the EHD within 30 days of <br /> testing . <br />