My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
322
>
2300 - Underground Storage Tank Program
>
PR0516472
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 12:56:10 PM
Creation date
9/28/2020 9:21:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0516472
PE
2361
FACILITY_ID
FA0012628
FACILITY_NAME
UNITED #5449
STREET_NUMBER
322
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14906111
CURRENT_STATUS
01
SITE_LOCATION
322 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities <br /> NOTE : If the fill cap is not included in the the spill bucket . The vacuum level is monitored for <br /> spill bucket test and/or the cap is not tight , it a 1 - minute period . <br /> could be the source of potential fuel contami- 6 . 3 . 3 Test Equipment . Test equipment shall <br /> nation from water intrusion . include : <br /> • vacuum test apparatus (The test apparatus may <br /> NOTE : Before permanently plugging , ensure be available from the spill bucket manufacturer. <br /> that local regulations allow the drain valve to It includes an air pressure regulator, a vacuum <br /> be permanently plugged . source, a vacuum gauge with a minimum 0-50 <br /> inch water column range and a control valve . <br /> 6 . 2 . 5 Test Procedure . The control valve is used to adjust the vacuum <br /> 1 . Add water to the spill bucket to a level within level . ) ; <br /> 1 . 5 inches of the top of the spill bucket. Allow test cover (The cover is equipped with a test fit- <br /> the water to settle for 5 minutes before the initial ting . ) ; <br /> water level measurement is taken . <br /> • plumber ' s plug (appropriate size, if used) ; <br /> 2 . Place the measuring stick vertically at the lowest <br /> point in the spill bucket and extending above the stopwatch or other time-measurement device <br /> water level to allow for an accurate measure- capable of measuring a 1 - second increment ; <br /> meat to be taken . The location Of the measurincr Basketing material (The purpose of the gas- <br /> stick must remain the same for each water level keting material is to provide an air-tight seal <br /> measurement. Document the initial water level between the test cover and the spill bucket . ) . <br /> measurement as measured from the bottom of <br /> the spill bucket . Alternative measurement meth- 0 50" water Column <br /> ods may be used provided that measurement to Vacuum Vacuum Gauge <br /> 1 / 16 (0 . 063 ) inch can be made . Source <br /> 3 . Take all precautions to prevent the water level <br /> from being disturbed during the duration of the Control <br /> test . Valve <br /> 4 . After 1 hour, document the ending water level <br /> measurement. <br /> 5 . Upon completion of the test, remove and dis- <br /> pose of the water according to Section 6 . 7 , and <br /> dry the inside of the spill bucket before returning Plumber's Plug in <br /> it to service . Tank Riser Pipe <br /> 6 . 2 . 6 Pass/Fail Criteria . If the water level has <br /> dropped less than 1 /8 (0 . 125 ) inch, the spill bucket <br /> passes the integrity test. <br /> If the water level has dropped 1 /8 (0 . 125 ) inch or <br /> greater, the spill bucket fails the integrity test . <br /> 6 . 3 Spill Bucket Integrity Testing — Vacuum Test FIGURE 6-2 . The cover must make a tight seal with the <br /> Method . spill bucket to prevent leakage when the vacuum is <br /> 6 . 3 . 1 Purpose . This method is used to test the pulled during the test. <br /> integrity of single-walled spill buckets or the pri- <br /> mary containment of secondarily contained spill WARNING • Use only an air-operated vac- <br /> buckets . <br /> uum source or a vacuum pump pow- <br /> 6 . 3 . 2 Description of Test . Using a specially ered by an explosion-proof motor. Vacuum <br /> equipped test cover, a partial vacuum is applied to pumps with electric motors that are not <br /> pei . org <br />
The URL can be used to link to this page
Your browser does not support the video tag.