My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
322
>
2300 - Underground Storage Tank Program
>
PR0516472
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 12:56:10 PM
Creation date
9/28/2020 9:21:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0516472
PE
2361
FACILITY_ID
FA0012628
FACILITY_NAME
UNITED #5449
STREET_NUMBER
322
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14906111
CURRENT_STATUS
01
SITE_LOCATION
322 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at LIST Facilities <br /> • vacuum test apparatus (The test apparatus may 4 . Connect the line from the vacuum source to the <br /> be available from the spill-bucket manufacturer. test apparatus . <br /> It includes an air pressure regulator, a vacuum 5. If the spill bucket is found to have cracks , loose <br /> source, a vacuum gauge with a minimum 0- 30 parts or separation of the bucket from the fill <br /> inch water column range , a test fitting and a pipe , it is not considered to be liquid-tight. This <br /> control valve . The control valve is used to adjust visually indicates a test failure . <br /> the vacuum level . ) ; <br /> • stopwatch or other time-measurement device 6 . 4 . 5 Test Procedure . <br /> capable of measuring a 1 -second increment. 1. Slowly apply a vacuum of 15 inches water <br /> column to the spill bucket interstitial space and <br /> WARNING• Use only an air-operated vacu- close the control valve . If a 15 -inch water Col - <br /> um source or a vacuum pump powered by umn vacuum cannot be attained, the spill bucket <br /> an explosion-proof motor. Vacuum pumps fails the test. See Appendix B for pressure and <br /> with electric motors that are not explo- vacuum conversions . <br /> sion-proof may ignite flammable vapors . 2 . Start the time-measurement device and record <br /> If a portable air compressor is used , it the initial vacuum level shown on the gauge . <br /> should be located at least 20 feet away <br /> from the venturi-eductor or outside any 3 . After 1 minute, record the ending vacuum level . <br /> Class I , Division 1 area . Upon completion of the test, release the vacuum , <br /> remove the test apparatus and restore the spill <br /> Vacuum bucket to its normal operating condition . <br /> Source Control Valve <br /> o - s0° Water Column 6 . 4. 6 Pass/ Fail Criteria . If the ending vacuum <br /> � Vacuum Gauge <br /> level is 12 inches water column or greater, the spill <br /> bucket passes the test . <br /> Regulator <br /> If the ending vacuum level is less than 12 inches <br /> water column , the spill bucket fails the test. <br /> 6 . 5 Containment Sump Integrity Testing. <br /> CAUTION : Gaining access to the contain- <br /> ment sump requires removing the lid , <br /> cover or dispenser panel that is in place to <br /> protect the equipment in the sump . These <br /> components can be heavy. They may <br /> require special handling and more than <br /> FIGURE 64 . Check lines and connections to ensure one person to remove them . Use caution <br /> that they are leak-tight before starting the test. when moving and replacing them when <br /> testing is complete . During the test , put <br /> the covers and panels in a safe location <br /> 6 . 4. 4 Preparation . where they are secure and isolated from <br /> 1. Remove and properly dispose of any liquid and vehicle and customer traffic . <br /> debris (leaves , sediment and trash) in the spill <br /> bucket. 6 . 5 . 1 General . Containment sumps are liquid- <br /> 2 . Clean the spill bucket and examine it for dam- tight structures designed to temporarily contain <br /> age . Make sure that it is free of cracks , loose leaks or spills . In addition , containment sumps <br /> parts or separation of the bucket from the fill often serve as the leak detection monitoring loca- <br /> pipe . If the spill bucket is damaged, notify the tion for double-walled piping systems . Leakage <br /> pipe , If <br /> spill <br /> from the primary containment typically flows by <br /> owngravity inside the secondary containment to the <br /> 3 . Attach the test apparatus to the test port . <br /> pei . org <br />
The URL can be used to link to this page
Your browser does not support the video tag.