My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 10:36:10 AM
Creation date
9/28/2020 12:43:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI INC
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Environmental Reporting System (CERS) Underground Storage Tank- Monitoring Plan <br /> Facility/Site <br /> ARCH AND BIANCHI CHEVRON LIST Tank# CERSID <br /> 916 E MARCH LN REG 10186995 <br /> TOCKTON,CA 95210 Tank Info:Installed Date:8/1/200812:00:00 AM-Tank Use:Motor Vehicle Fueling-Tank <br /> Contents:Regular Unleaded-Type Of Tank:Double Wall-Piping Construction:Double- <br /> walled <br /> Pipe Monitoring is Performed Using the Following Method(s) <br /> Yes Continuous Monitoring of Piping Secondary Containment <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Under Vacuum VEEDEROOT VEEDEROOT <br /> Panel Model p Leak Sensor Model n <br /> TLS-35OR 330020.479,304,208 <br /> Yes Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes Failure/Disconnect Triggers Pump Shutdown <br /> Mechanical Line Leak Detector Performs 3 GPH Leak Test <br /> MLLD Manufacturer MLLD Model <br /> Yes Electronic Line Leak Detector Performs 3 GPH Leak Test <br /> ELLD Manufacturer ELLD Programmed In-Line Testing ELLD Triggers Automatic Pump Shutdown <br /> EEDEROOT Yes <br /> LLD Model ELLD Failure/Disconnect Triggers Automatic Shutdown <br /> 48480-001 Yes <br /> Pipeline Integrity Testing Visual Pipeline Monitoring <br /> Pipeline Integrity Testing Frequency Visual Pipeline Monitoring Frequency <br /> Suction Piping Meets Exemption Criteria <br /> No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 Is Connected To The Tank System <br /> Other Pipeline Monitoring <br /> Under Dispenser Containment(UDC)Monitoring <br /> DC Monitoring; Detection of Leak into UDC Triggers Audible and Visual Alarms <br /> Continuous Yes <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown <br /> DC Panel Manufacturer Yes <br /> EEDEROOT Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br /> DC Panel Model fi Yes <br /> Is-350r UDC Monitoring Stops Flow of Product at Dispenser <br /> DC Leak Sensor Manufacturer Yes <br /> EEDEROOT UDC Construction <br /> DC Leak Sensor Model Double-walled <br /> 30020-208,794380-304 UDC Secondary Containment Monitoring <br /> Liquid <br /> Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br /> Yes <br /> Periodic System Testing <br /> ELD Testing <br /> Secondary Containment Testing <br /> Yes Spill Bucket Testing <br /> Printed on 12/11/2017 12:42 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.