My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 10:36:10 AM
Creation date
9/28/2020 12:43:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI INC
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> PDDESIGNATED;IUNDERGROUND STORAGE TANK OPERATOR VISUAL INSPECTION REPORT(Page 2 of 2) <br /> VII. INSPECTION HISTORY <br /> aseach follow-up action of Section III from the previous inspection been completed appropriately? N <br /> Attach documentation verifying appropriate service to this report. 0 ❑ <br /> VIII. ALARM HISTORY <br /> Attach a copy of the alarm histo re ort/lo Y N NA to this report- ❑ ❑ <br /> Is the monitonn system powered on and in proper operatingmode? <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? ❑ <br /> Attach documentation verifying appropriate service to this report. <br /> Have all containment sumps that have had a leak detection alarm since the previous inspection been responded to by a ❑ ❑ <br /> qualified UST Service Technician? <br /> List below in Section IX all containment sumps that have had a leak detection alarm since the previous inspection and have not been <br /> responded to by a qualified UST Service Technician.Containment sumps listed below require a visual inspection for damage,water,debris, <br /> hazardous substance,and proper sensor location. The results of the visual inspection must be recorded in Section IX. <br /> IX. UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> Is the containment sump free of damage.water, debris, and hazardous substance? Y N <br /> Containment Sum ID Y N Containment Sum ID <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ 1`7 ❑ <br /> �/ ❑ ❑ _/ ❑ ❑ <br /> [0] ElEl ❑ <br /> Are all sensors in containment sumps inspected locatec to detect a leak at the earliest opportunity? ❑ ❑ <br /> Is the spill container free of damage,water. debris, and hazardous substance? ❑ <br /> Tank ID ❑i Tank ID <br /> Tank ID ❑ Tank ID ❑ ❑ <br /> Is the fill pipe free of obstructions? ElTank ID Q" ❑ Tank ID ❑ ❑ <br /> Tank ID I ❑ Tank ID <br /> Is the fill ca urely on the fill pipe? El <br /> kID El Tank ID <br /> Tank ID <br /> ❑ Tank ID ❑ F1 <br /> Is the under-dispenser containment free of damage,water,debris, and hazardous <br /> s substance? <br /> enser Containment ID Y, N NA <br /> Under-Dispenser Containment ID Y N NA P [1 ❑ <br /> Dispenser 1/2 ❑ ❑ Dis enser 3/4 ❑ ❑ <br /> Dispenser 5/6 Gl El enser 718 <br /> [] ❑ ❑ Dispenser 11/12 El ❑ <br /> Dispenser 9/10 ❑ <br /> El D <br /> ❑ ❑ 11 ❑ [1[I El ET ❑ ❑ <br /> Are all sensors in under-dispenser containment located to detect a leak at the earliest opportunity? <br /> Y N NA Date Last <br /> X. TESTING AND MAINTENANCE Performed <br /> 11/18/2019 <br /> Has the monitoring system certification been completed within the past 12 months? ❑ 11/18/2019 <br /> Has the spill container testing been completed within the past 12 months? <br /> Has the overfill prevention equipment inspection been completed within the past 36 months? ❑ <br /> Has the secondary containment testing been completed within the past 36 months? U 0 LX-1Has the tank tightness testing been completed within required timeframes? <br /> El <br /> Has the line tightness testing been completed within the required timeframes? ❑ ❑ <br /> Other required testing/maintenance was completed within required timeframe. (List testlmaintenance items . 10/7/2019 <br /> Test/Maintenance:Va or ReCove ❑ ❑ " 1 4/13/2018 <br /> Test/Maintenance:Bi-Annual V/L's ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance ❑ ❑ <br /> Test/Maintenance: ❑ ❑ <br /> Test/Maintenance: Y N <br /> XI. FACILITY EMPLOYEE TRAINING <br /> Have all individuals performing facility employee duties received the required facility employee training within the past 12 months? El <br /> I the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> Y=Yes,N =No,NA=Not Applicable.10=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.